Earned Value Method (EVM) for Construction Projects: Current Application and Future Projections

نویسندگان

چکیده

The earned value method (EVM) is an internationally known technique for project management that emphasizes the control of cost performance and duration, thus allowing trends to be identified during execution warning manager variances may affect so they can take necessary corrective measures. In this research, finished projects a construction company in city Cuenca, Ecuador, were assessed. EVM was applied from database developed with information each one rebuild past events, existing problems, critical points evaluate over time. results analysis are meant determine project’s success, calculating variance at end. motivates stakeholders pay attention costs progress timely actions taken optimize resources, resulting completion within budget on conclusion, plays essential role integral terms scope, time, cost. Moreover, there now guidelines applying as tool future projects.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

The Cost Monitoring of Construction Projects Through Earned Value Analysis

In construction industry, the term ‘procurement’ is considered as a project based job where clients and contractors are always keen to observe performance indicators. These indicators represent financial and non-financial efficiency of project activities. Among these, the monitoring of financial indicators is an important function of project management. Therefore, during the construction phase,...

متن کامل

Using Earned Value Management (EVM) in Spiral Development

Use of any trademarks in this report is not intended in any way to infringe on the rights of the trademark holder. Internal use. Permission to reproduce this document and to prepare derivative works from this document for internal use is granted, provided the copyright and " No Warranty " statements are included with all reproductions and derivative works. External use. Requests for permission ...

متن کامل

A time-dependent earned value model for software projects

This paper proposes a formal method for including time dependence into Earned Value (EV) management. The model requires three parameters, which map directly to the fundamental “triple constraint” of scope, cost, and schedule: the reject rate of activities, the cost overrun parameter, and the time to repair the rejected activities. Time dependent expressions for the planned value, earned value, ...

متن کامل

Important Factors for Organizational Performance Evaluation through Implementation of Earned Value Management (EVM) in North Taiwan

In order to cope with the rapid changes in the world, enterprises utilize project management methodology to globally outsource their works and to evaluate their internal and external work performance. Of all the project management techniques, Earned Value Management (EVM) is the major one that provides a method to evaluate project performance by integrating schedule and cost of work packages. E...

متن کامل

A New Version of Earned Value Analysis for Mega Projects Under Interval-valued Fuzzy Environment

The earned value technique is a crucial and important technique in analysis and control the performance and progress of mega projects by integrating three elements of them, i.e., time, cost and scope. This paper proposes a new version of earned value analysis (EVA) to handle uncertainty in mega projects under interval-valued fuzzy (IVF)-environment. Considering that uncertainty is very common i...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Buildings

سال: 2022

ISSN: ['2075-5309']

DOI: https://doi.org/10.3390/buildings12030301