Earned Value Concept as a Method to Analyze Cost and Time Control

نویسندگان

چکیده

The successful construction of infrastructure is dependent on many aspects, including at least time, cost, and control. With good control, deviations during the execution work are expected to be minimized. In case "MAS BIMACIKA" Service Office Building Construction project, acceleration becomes an issue. Acceleration needs more resources than normal conditions, addition required achieve productivity value as planned. This study aimed examine time cost performance in Project. Earned Value Concept, Crashing Overlapping method used analyze costs resulting from work, were adopted process controlling. Budget Cost Work Schedule, Performance, Actual Performance parameters study. From results analysis carried out until week 5, it observed that could completed earlier. condition indicated by BCWP which higher BCWS. However, perspective, resulted wastage. finding confirmed shown below ACWP. 10th show terms costs, contractors still gained profit. statement supported ACWP BCWP.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A time-cost trade-off model by incorporating fuzzy earned value management: A statistical based approach

Time–cost trade-off problems (TCT) are well-known in project management contents. This approach normally applied for scheduling of a project especially where the project should be completed under pre-determined deadline. This paper aims to extend time-cost trade-off (TCT) problems in order to provide a well-organized mechanism for both scheduling and rescheduling processes of a project. The pro...

متن کامل

Practical Experiences of Cost/Schedule Measure Through Earned Value Management and Statistical Process Control

Cost and schedule measures are the most important support activities for the success of a project; it provides the basis for process improvement and project management. This paper reports practical experiences on using EVM (Earned Value Management) and SPC(Statistical Process Control) in cost/ schedule measure. The analysis of experience data indicates the distributions of CPI(Cost Performance ...

متن کامل

The Cost Monitoring of Construction Projects Through Earned Value Analysis

In construction industry, the term ‘procurement’ is considered as a project based job where clients and contractors are always keen to observe performance indicators. These indicators represent financial and non-financial efficiency of project activities. Among these, the monitoring of financial indicators is an important function of project management. Therefore, during the construction phase,...

متن کامل

A time-dependent earned value model for software projects

This paper proposes a formal method for including time dependence into Earned Value (EV) management. The model requires three parameters, which map directly to the fundamental “triple constraint” of scope, cost, and schedule: the reject rate of activities, the cost overrun parameter, and the time to repair the rejected activities. Time dependent expressions for the planned value, earned value, ...

متن کامل

Improved cost monitoring and control through the Earned Value Management System

As economic pressure and competition for budget among federal agencies has increased, there has been an increasing need for more granular data and robust management information systems. This is especially true for the execution of major civilian space programs. This need has resulted in new program management requirements being implemented in an attempt to limit cost and schedule growth. In par...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: JACEE (Journal of Advanced Civil and Environmental Engineering)

سال: 2022

ISSN: ['2599-3356']

DOI: https://doi.org/10.30659/jacee.5.2.103-112