Dynamic Transformation During the Simulated Hot Rolling of an API‐X80 Steel
نویسندگان
چکیده
منابع مشابه
Effect of Composition on the Recrystallization Behavior of if Steels During Simulated Hot Strip Rolling
Flow curves are generated in muti-pass torsion tests for a titanium stabilized and a niobium stabilized IF steel. Two types of test schedule are used, one based on plate rolling and the other approximating strip rolling. The purpose of the former is to define the three critical temperatures of steel rolling. The strip schedules are varied in order to investigate the influence of increasing the ...
متن کاملStrain-Induced Martensite Transformation Simulations during Cold Rolling of AISI 301 Austenitic Stainless Steel
Austenite is a semi-stable phase in most stainless steels that deforms to martensite under Md30 and forms martensitetype ά and ε due to the deformation in the steels. Since the distribution of strain induced martensite plays animportant role in achieving desired properties, the main objective of the present work is to model martensitedistribution of ά during cold rolling using...
متن کاملModeling of Cracks Presence in Steel after Hot Rolling
The optimal material processing in steel industry is difficult because of the multi-constituent and multiphase character of the commercial steels, variety of the possible processing paths, and plant specific equipment characteristics. This paper shows implementation of the genetic programming approach for crack presence modeling after rolling. The data (110 samples covering 7 different steel gr...
متن کاملCase Study: Temperature Control of Hot Rolling Steel
In this case study we discuss a simple control system used for obtaining a desirable downstream surface temperature inside a hot rolling steel sheet, presented by Bao Steel in the HK Study Group with Industry, held at the City University of Hong Kong, July 2002.
متن کاملA multi-agent architecture for dynamic scheduling of steel hot rolling
Steel production is a complex process and finding coherent and effective schedules for the wide variety of production steps, in a dynamic environment, is a challenging task. In this paper we propose a multi-agent architecture for integrated dynamic scheduling of the hot strip mill and the continuous caster. The scheduling systems of these processes have very different objectives and constraints...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: steel research international
سال: 2019
ISSN: 1611-3683,1869-344X
DOI: 10.1002/srin.201900091