منابع مشابه
OKP Supply Chain Scheduling
In one-of-a-kind production (OKP), a firm usually keeps zero stock for some components of which the demand is unstable. In this work, we model the scheduling problem for the OKP firm who promises due-date-guaranteed delivery to its customers. The firm schedules its jobs to minimize its total cost concerning the constraint of components delivery from its supplier. We develop a pair-wise scheduli...
متن کاملSupply chain scheduling: Sequence coordination
A critical issue in supply chain management is coordinating the decisions made by decisionmakers at different stages, for example a supplier and one or several manufacturers. We model this issue by assuming that both the supplier and each manufacturer have an ideal schedule, determined by their own costs and constraints. An interchange cost is incurred by the supplier or a manufacturer whenever...
متن کاملAn Integrated Hydrocarbon Biofuel and Petroleum Supply Chain: Designing and Planning a Dynamic Supply Chain Network
One of the main challenges of bioenergy sector development is the cost of biomass supply chain resulted from inefficient bioenergy production from low energy content biomass feedstocks, high logistics costs of biomass production, handling and transportation. Another main aspect to be considered is that the configuration of a biofuel supply chain can be dynamic which evolve over time. Growing de...
متن کاملAn Integrated Hydrocarbon Biofuel and Petroleum Supply Chain: Designing and Planning a Dynamic Supply Chain Network
One of the main challenges of bioenergy sector development is the cost of biomass supply chain resulted from inefficient bioenergy production from low energy content biomass feedstocks, high logistics costs of biomass production, handling and transportation. Another main aspect to be considered is that the configuration of a biofuel supply chain can be dynamic which evolve over time. Growing de...
متن کاملA Genetic Algorithm Developed for a Supply Chain Scheduling Problem
This paper concentrates on the minimization of total tardiness and earliness of orders in an integrated production and transportation scheduling problem in a two-stage supply chain. Moreover, several constraints are also considered, including time windows due dates, and suppliers and vehicles availability times. After presenting the mathematical model of the problem, a developed version of GA c...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Scheduling
سال: 2010
ISSN: 1094-6136,1099-1425
DOI: 10.1007/s10951-010-0189-6