Dynamic optimization of open-pit coal mine production scheduling based on ARIMA and fuzzy structured element

نویسندگان

چکیده

A dynamic optimization method was created to address the production schedule issue in an open-pit coal mine while taking into account characteristics of fuzzy structured element. The mining capacities all “geologically optimal push-back bodies” were then examined using moving cove method. One most crucial elements process scheduling is pricing. As a result, this work also presents technique for that incorporates prediction economic time series and generation indices. An appropriate model forecast future price based on previous data prices. results are used calculation body dynamically obtain model. Baorixile Open-pit Coal Mine China’s Inner Mongolia Autonomous Region Autoregressive Integrated Moving Average Model ARIMA constructed anticipate 23 years by evaluating processing from 2009 2022, ideal scheme economics afterwards identified. volume, potential life, total net present value ( NPV ) annual provided at same time. findings can better give fundamental support design since problem accurately expressed correct formulations.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A genetic algorithm approach for open-pit mine production scheduling

In an Open-Pit Production Scheduling (OPPS) problem, the goal is to determine the mining sequence of an orebody as a block model. In this article, linear programing formulation is used to aim this goal. OPPS problem is known as an NP-hard problem, so an exact mathematical model cannot be applied to solve in the real state. Genetic Algorithm (GA) is a well-known member of evolutionary algorithms...

متن کامل

An imperialist competitive algorithm for solving the production scheduling problem in open pit mine

Production scheduling (planning) of an open-pit mine is the procedure during which the rock blocks are assigned to different production periods in a way that the highest net present value of the project achieved subject to operational constraints. The paper introduces a new and computationally less expensive meta-heuristic technique known as imperialist competitive algorithm (ICA) for long-term...

متن کامل

A Two-Phase Simulation-Based Optimization of Hauling System in Open-Pit Mine

One of the key issues in mining is the hauling system. Truck and shovels are the most widely used transportation equipment in mines. In this paper, a two-phase simulation-based optimization is presented to maximize utilization of hauling system in the largest Iranian open-pit copper mine. In the first phase, The OptQuest for Arena software package was used to solve the optimization problem to p...

متن کامل

A Comprehensive Study of Several Meta-Heuristic Algorithms for Open-Pit Mine Production Scheduling Problem Considering Grade Uncertainty

It is significant to discover a global optimization in the problems dealing with large dimensional scales to increase the quality of decision-making in the mining operation. It has been broadly confirmed that the long-term production scheduling (LTPS) problem performs a main role in mining projects to develop the performance regarding the obtainability of constraints, while maximizing the whole...

متن کامل

A new algorithm for the open-pit mine scheduling problem

For the purpose of production scheduling, open pit mines are discretized into threedimensional arrays known as block models. Production scheduling consists in deciding which blocks should be extracted, when they should be extracted and how each extracted block should be processed. Blocks which are on top should be extracted first, and capacity constraints limit the production each time period. ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Frontiers in Earth Science

سال: 2023

ISSN: ['2296-6463']

DOI: https://doi.org/10.3389/feart.2022.1040464