Dynamic multi-priority, multi-class patient scheduling with stochastic service times

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Achieving differentiated services through multi-class probabilistic priority scheduling

Differentiated services (DiffServ) is a promising architecture for the next generation Internet due to its scalable and flexible design. In DiffServ, scheduling disciplines play an important role in achieving service differentiation. In this paper, we extend the average delay analysis of the probabilistic priority (PP) scheduling discipline first proposed in [Proc. 2001 IEEE Workshop on High Pe...

متن کامل

A Probabilistic Priority Scheduling Discipline for Multi-Service Networks

This paper proposes a novel scheduling discipline for service differentiation in multi-service networks, which is referred to as the Probabilistic Priority (PP) discipline. PP is based on the Strict Priority (SP) discipline with the difference that each priority class is assigned a parameter. The parameter determines the probability with which its corresponding queue is served when it is polled...

متن کامل

Multi-Priority Online Scheduling with Cancellations

Authors are encouraged to submit new papers to INFORMS journals by means of a style file template, which includes the journal title. However, use of a template does not certify that the paper has been accepted for publication in the named journal. INFORMS journal templates are for the exclusive purpose of submitting to an INFORMS journal and should not be used to distribute the papers in print ...

متن کامل

A New Multi-objective Job Shop Scheduling with Setup Times Using a Hybrid Genetic Algorithm

This paper  presents a new multi objective job shop scheduling with sequence-dependent setup times. The objectives are to minimize the makespan and sum of the earliness and tardiness of jobs in a time window. A mixed integer programming model is developed for the given problem that belongs to NP-hard class. In this case, traditional approaches cannot reach to an optimal solution in a reasonable...

متن کامل

Multi-Objective Unrelated Parallel Machines Scheduling with Sequence-Dependent Setup Times and Precedence Constraints

This paper presents a novel, multi-objective model of a parallel machines scheduling problem that minimizes the number of tardy jobs and total completion time of all jobs. In this model, machines are considered as unrelated parallel units with different speeds. In addition, there is some precedence, relating the jobs with non-identical due dates and their ready times. Sequence-dependent setup t...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: European Journal of Operational Research

سال: 2020

ISSN: 0377-2217

DOI: 10.1016/j.ejor.2019.06.040