DYNAMIC MACHINING PROJECT CONTROL MODEL UNDER ORDER QUANTITY AND DEADLINE CONSTRAINTS

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Dynamic Machining Project Control Model under Order Quantity and Deadline Constraints

To achieve the optimal control of material removal rate (MRR) for a machining project, a Dynamic Machining Project Control (DMPC) Model is proposed under the considerations of order quantity and deadline constraints. This paper not only introduces material removal rate into the objective function dynamically, but also implements Calculus of Variations to resolve the continuous control problem c...

متن کامل

Optimal Relief Order Quantity under Stochastic Demand and Lead-time

In this paper, a newsboy model is developed under uniformly distributed lead-time and demand that is an appropriate assumption in obtaining optimal relief inventory of humanitarian disasters. It is noteworthy that limited historical data are in hand on relief operations. Hence, analytical and approximate solutions for optimal relief order quan­tity were derived. The effect of lead-time uncertai...

متن کامل

Multi-objective supplier selection and order allocation under quantity discounts with fuzzy goals and fuzzy constraints

Abstract: This paper investigates a multi-objective supplier selection and order allocation problem under quantity discounts in a fuzzy environment. Prior research on supplier selection and order allocation with quantity discounts mainly considered partial fuzziness of the decision problem; a situation where both the objectives of the decision maker and the constraints are fuzzy has not been st...

متن کامل

Optimal Power Control and Scheduling under Hard Deadline Constraints for Continuous Fading Channels

We consider a joint scheduling-and-powerallocation problem of a downlink cellular system. The system consists of two groups of users: real-time (RT) and non-realtime (NRT) users. Given an average power constraint on the base station, the problem is to find an algorithm that satisfies the RT hard deadline constraint and NRT queue stability constraint. We propose a sum-rate-maximizing algorithm t...

متن کامل

Dynamic Power Control under Energy and Delay Constraints

1 Information-theoretic limits of fading channels have been discussed extensively in the literature under average power constraints. In this paper, we introduce total energy constraints on transmission and study dynamic power control on a time varying channel. Three types of delay constraints are discussed: no delay constraint, soft delay constraint and strict delay constraint. We consider a bl...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of the Operations Research Society of Japan

سال: 2002

ISSN: 0453-4514,2188-8299

DOI: 10.15807/jorsj.45.83