A Dynamic Lot-Sizing Model with Demand Time Windows
One of the basic assumptions of the classical dynamic lot-sizing model is that the aggregate demand of a given period must be satisfied in that period. Under this assumption, if backlogging is not allowed then the demand of a given period cannot be delivered earlier or later than the period. If backlogging is allowed, the demand of a given period cannot be delivered earlier than the period, but...
متن کاملLot-sizing with production and delivery time windows
We study two different lot-sizing problems with time windows that have been proposed recently. For the case of production time windows, in which each client specific order must be produced within a given time interval, we derive tight extended formulations for both the constant capacity and uncapacitated problems with Wagner-Whitin (non-speculative) costs. For the variant with nonspecific order...
متن کاملA Dynamic Lot - Sizing Model with Demand Time Windows Econometric Institute Report EI - 9948 / A
One of the basic assumptions of the classical dynamic lot-sizing model is that the aggregate demand of a given period must be satisfied in that period. Under this assumption, if backlogging is not allowed then the demand of a given period cannot be delivered earlier or later than the period. If backlogging is allowed, the demand of a given period cannot be delivered earlier than the period, but...
متن کاملUncapacitated lot-sizing problem with production time windows, early production, backlog and lost sale
We consider the single item uncapacitated lot-sizing problem with production time windows, lost sale, early production and backlog over a planning horizon of T periods. In this context, a demand not processed within its time window can either be lost (lost sale), satisfied from a production that is processed before the release period of the demand (early production) or satisfied from a producti...
متن کاملA dynamic uncapacitated lot-sizing problem with co-production
We consider an extension of the dynamic uncapacitated lot-sizing problem to account for co-production, where multiple products are produced simultaneously in a single production run. We formulate the problem as a mixed-integer linear programming problem. We then show that a variant of the well-known zero-inventory property holds for this problem, and use this property to extend a dynamic progra...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Naval Research Logistics
سال: 2007
ISSN: 0894-069X,1520-6750
DOI: 10.1002/nav.20246