reliabilty assessment of conceptual cost estimates for building construction projects

in the early stages of a construction project, the reliability and accuracy of conceptual cost estimates are major concerns for clients and cost engineers. previous studies applied scoring methods and established common rules or mathematical methods to assess the quality of cost estimates. however, those approaches have some limitations in adapting to real-world projects or require understandin...

متن کامل

Dynamic Risk Assessment in Construction Projects Using Bayesian Networks

This paper presents a systemic Bayesian network (BN) based approach for dynamic risk assessment for adjacent buildings in tunnel construction. This approach consists of four steps in detail, namely, hazard analysis, BN learning and BN-based risk analysis. In the dynamic risk analysis framework, the predictive, sensitivity and diagnostic analysis techniques in the Bayesian inference are used to ...

متن کامل

Assessing Embodied Energy and Greenhouse Gas Emissions in Infrastructure Projects

Greenhouse gas (GHG) emissions from construction processes are a serious concern globally. Of the several approaches taken to assess emissions, Life Cycle Assessment (LCA) based methods do not just take into account the construction phase, but consider all phases of the life cycle of the construction. However, many current LCA approaches make general assumptions regarding location and effects, ...

متن کامل

Modeling construction time in Spanish building projects

The literature states that project duration is affected by various scope factors. Using 168 building projects carried out in Spain, this paper uses the multiple regression analysis to develop a forecast model that allows estimating project duration of new builds. The proposed model uses project type, gross floor area (GFA), the cost/GFA relationship and number of floors as predictor variables. ...

متن کامل

Determining Optimal Risk Assessment Model in Construction Projects (Case study: steel plant construction project)

Introduction: Identifying occupational hazards and managing occupational safety and health risks is the most important mission and responsibility of the health and safety management system in organizations and adopting coded plans to achieve this is the key to continuously improving this system and promoting it. Method: This descriptive-analytic research has been written to determine the optim...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Sustainability

سال: 2019

ISSN: 2071-1050

DOI: 10.3390/su11133724