Due-window assignment scheduling with job-rejection, truncated learning effects and setup times

نویسندگان

چکیده

This paper investigates the single-machine due-window assignment scheduling with truncated learning effects and past-sequence-dependent setup times simultaneously. The scheduler has option of job-rejection, i.e., some jobs are processed other rejected. Under three (i.e., common, slack different) methods, our goal is to minimize sum a general earliness-tardiness cost weighted earliness-tardiness, number early tardy jobs, starting time size due-window) total rejection cost. Some optimal properties problem provided, we demonstrate that polynomially solvable.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Due-Window Assignment Scheduling with Variable Job Processing Times

We consider a common due-window assignment scheduling problem jobs with variable job processing times on a single machine, where the processing time of a job is a function of its position in a sequence (i.e., learning effect) or its starting time (i.e., deteriorating effect). The problem is to determine the optimal due-windows, and the processing sequence simultaneously to minimize a cost funct...

متن کامل

A Job Shop Scheduling Problem with Sequence-Dependent Setup Times Considering Position-Based Learning Effects and Availability Constraints

 Sequence dependent set-up times scheduling problems (SDSTs), availability constraint and transportation times are interesting and important issues in production management, which are often addressed separately. In this paper, the SDSTs job shop scheduling problem with position-based learning effects, job-dependent transportation times and multiple preventive maintenance activities is studied. ...

متن کامل

Stochastic Sequencing with Job Families , Setup Times , and Due

We consider the problem of allocating a single server to families of jobs with random service times and due dates. Furthermore, a setup is required when the server switches from one job family to another. We address the problems of minimizing expected weighted ow time, expected maximum lateness, and total weighted tardiness with emphasis on problems for which it is assumed that each family can ...

متن کامل

Common Due-Date Assignment and Scheduling on Parallel Machines with Sequence-Dependent Setup Times

This paper considers common due-date assignment and scheduling on parallel machines. The main decisions are: (a) deter-mining the common due-date; (b) allocating jobs to machines; and (c) sequencing the jobs assigned to each machine. The objective is to minimize the sum of the penalties associated with common due-date assignment, earliness and tardiness. As an extension of the existing studies ...

متن کامل

Iterative-Sampling Search for Job Shop Scheduling with Setup Times

This paper presents a heuristic algorithm for solving the job-shop scheduling problem with sequence dependent setup times (SDST-JSSP). The algorithm relies on a core constraint-based search procedure, which generates consistent ordering of activities requiring the same resource by incrementally imposing precedence constraints on a temporal feasible solution. Key to the effectiveness of the sear...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Industrial and Management Optimization

سال: 2023

ISSN: ['1547-5816', '1553-166X']

DOI: https://doi.org/10.3934/jimo.2023079