Due date optimization in multi-objective scheduling of flexible job shop production
نویسندگان
چکیده
منابع مشابه
Solving Flexible Job Shop Scheduling with Multi Objective Approach
In this paper flexible job-shop scheduling problem (FJSP) is studied in the case of optimizing different contradictory objectives consisting of: (1) minimizing makespan, (2) minimizing total workload, and (3) minimizing workload of the most loaded machine. As the problem belongs to the class of NP-Hard problems, a new hybrid genetic algorithm is proposed to obtain a large set of Pareto-optima...
متن کاملMulti-Objective Flexible Job Shop Scheduling Optimization Models (II)
For the Multi-Objective Flexible Job Shop Scheduling Problems (MOFJSSP), various optimization models have been designed. In the first part of the research (published in no. 2/2012) we presented the multi-sort production systems, the theoretical aspects of MOFJSSP framework, a specific real JSS process in drugs industry based on over 600 tasks to be optimally scheduled (used as a case study for ...
متن کاملMulti-Objective Flexible Job Shop Scheduling Optimization Models (I)
In manufacturing area, the most difficult problems related to the time-efficiency frequently occur if the jobs to be scheduled are heterogeneous, if there are alternative routes on the machines for the jobs and multiple objectives are imposed. This framework, named Multi-Objective Flexible Job Shop Scheduling Problems (MOFJSSP), has been formalized, modeled and studied in the last decades from ...
متن کاملDerleme Makalesi MULTI OBJECTIVE FLEXIBLE JOB SHOP SCHEDULING PROBLEMS
Flexible job shop scheduling problem, is an extension of the classical job shop scheduling problem. In Flexible job shop scheduling problem, there are more than one machine with the same features for the same purpose. The problem can be defined as appointing the jobs to the machines (assignment) and ordering the jobs at each machine (sequencing) to serve the desired purpose. Multi-objective fle...
متن کاملSolving Flexible Job Shop Scheduling with Multi Objective Approach
In this paper flexible job-shop scheduling problem (FJSP) is studied in the case of optimizing different contradictory objectives consisting of: (1) minimizing makespan, (2) minimizing total workload, and (3) minimizing workload of the most loaded machine. As the problem belongs to the class of NP-Hard problems, a new hybrid genetic algorithm is proposed to obtain a large set of Paretooptimal s...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Advances in Production Engineering & Management
سال: 2020
ISSN: 1854-6250,1855-6531
DOI: 10.14743/apem2020.4.380