Due-Date Estimation and Production Scheduling for Customer Orders with Unfixed Specification

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Due-date assignment and parallel-machine scheduling with deteriorating jobs

In this paper we study the problem of scheduling n deteriorating jobs on m identical parallel machines. Each job’s processing time is a nondecreasing function of its start time. The problem is to determine an optimal combination of the due-date and schedule so as to minimize the sum of the due-date, earliness and tardiness penalties. We show that this problem is NP-hard, and we present a heuris...

متن کامل

Coordinated Scheduling of Customer Orders for Quick Response

The scheduling problem addressed in this paper concerns a manufacturer who produces a variety of product types and operates in a make-to-order environment. Each customer order consists of known quantities of the different product types, and must be delivered as a single shipment. Periodically the manufacturer schedules the accumulated and unscheduled customer orders. Instances of this problem o...

متن کامل

Common due date scheduling with autonomous and induced learning

Yet, the few existing models considering learning effects in scheduling concentrate on learning-by-doing (autonomous learning). But recent contributions to the literature on learning in manufacturing organizations emphasize the important impact of proactive investments in technological knowledge on the learning rate (induced learning). In the present paper, we focus on a scheduling problem wher...

متن کامل

Job Scheduling with Unfixed Availability Constraints

Standard scheduling theory assumes that all machines are continuously available throughout the planning horizon. In many manufacturing and service management situations however, machines need to be maintained periodically to prevent malfunctions. During the maintenance period, a machine is not available for processing jobs. Hence, a more realistic scheduling model should take into account machi...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Advanced Mechanical Design, Systems, and Manufacturing

سال: 2010

ISSN: 1881-3054

DOI: 10.1299/jamdsm.4.559