منابع مشابه
Profinite completion and double-dual : isomorphisms and counter-examples
We define, for any group G, finite approximations ; with this tool, we give a new presentation of the profinite completion b π : G → b G of an abtract group G. We then prove the following theorem : if k is a finite prime field and if V is a k-vector space, then, there is a natural isomorphism between b V (for the underlying additive group structure) and the additive group of the double-dual V ∗...
متن کاملPrimal-Dual methods for sparse constrained matrix completion
We develop scalable algorithms for regular and non-negative matrix completion. In particular, we base the methods on trace-norm regularization that induces a low rank predicted matrix. The regularization problem is solved via a constraint generation method that explicitly maintains a sparse dual and the corresponding low rank primal solution. We provide a new dual block coordinate descent algor...
متن کاملA Dual Framework for Low-rank Tensor Completion
One of the popular approaches for low-rank tensor completion is to use the latent trace norm as a low-rank regularizer. However, most of the existing works learn a sparse combination of tensors. In this work, we fill this gap by proposing a variant of the latent trace norm which helps to learn a non-sparse combination of tensors. We develop a dual framework for solving the problem of latent tra...
متن کاملImage tag completion via dual-view linear sparse reconstructions
User-provided textual tags of web images are widely utilized for facilitating image management and retrieval. Yet they are usually incomplete and insufficient to describe the whole semantic content of the corresponding images, resulting in performance degradations of various tag-dependent applications. In this paper, we propose a novel method denoted as DLSR for automatic image tag completion v...
متن کاملEvaluating project’s completion time with Q-learning
Nowadays project management is a key component in introductory operations management. The educators and the researchers in these areas advocate representing a project as a network and applying the solution approaches for network models to them to assist project managers to monitor their completion. In this paper, we evaluated project’s completion time utilizing the Q-learning algorithm. So the ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of the Japanese Association for Petroleum Technology
سال: 1952
ISSN: 1881-4131,0370-9868
DOI: 10.3720/japt.17.122