Downtime model development for construction equipment management

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

The Development of an Integrated Knowledge Management Model for Construction

Knowledge management (KM) is now recognized for its potential to bring considerable gains to construction organizations, their projects and individual workers through social and technological interventions. There is however, a paucity of empirical research in this area, and furthermore a lack of integrated KM models in the literature. Continuing research into KM in the Irish construction indust...

متن کامل

Maintenance management decision model for preventive maintenance strategy on production equipment

In industries, Preventive Maintenance (PM) is not a new practice to minimise the sudden breakdown of production machine. PM will be performed at predetermine intervals to provide a balance between failure cost and component utilisation (aging). However, most of PM interval is based on experience or original equipment manufacturer (OEM) recommendations. Consequently, the benefits from PM are not...

متن کامل

MODEL BASED CONSTRUCTION PROCESS MANAGEMENT Model based construction process management

The purpose of this research was to study how the data management of a main contractor can be improved, in order to provide better client value and more costefficient production. The research focused on methods for reengineering the information management using product modelling as an enabling technology. The methods were tested in pilot tests in which the developed cost and value engineering p...

متن کامل

Change Management and Change Process Model for the Iranian Construction Industry

Changes are inevitable in construction projects. They could lead to disruptive impacts on the quality, schedule and budget of projects. Identifying changes and anticipating their consequences can help project teams mitigate these negative impacts. As a result, a change process model has been defined to improve this procedure. At first the present paper the defines some of the key terms in this ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Engineering, Construction and Architectural Management

سال: 2004

ISSN: 0969-9988

DOI: 10.1108/09699980410535804