DISPLACEMENT ANALYSIS OF SHEET PILE WITH TIE BEAM ON BREAKWATER CONSTRUCTION BY USING PLAXIS
نویسندگان
چکیده
منابع مشابه
construction of vector fields with positive lyapunov exponents
in this thesis our aim is to construct vector field in r3 for which the corresponding one-dimensional maps have certain discontinuities. two kinds of vector fields are considered, the first the lorenz vector field, and the second originally introced here. the latter have chaotic behavior and motivate a class of one-parameter families of maps which have positive lyapunov exponents for an open in...
15 صفحه اولNet pressure analysis of cantilever sheet pile walls
There are many methods for the analysis and design of embedded cantilever retaining walls. They involve various different simpli®cations of the net pressure distribution to allow calculation of the critical retained height. In the UK, it is commonly assumed that net pressure consists of the sum of the active and passive limiting pressure values. In the USA, the net pressure is commonly simpli®e...
متن کاملSensitivity Analysis of Mike21-BW Diffraction Model by using Breakwater Reflection Coefficient
DHI-Mike Software is one of best softwares describing water wave diffraction in onshore/offshore concepts. Diffraction happens due to obstacles along wave direction and has an important role in designing structures. The scope of this study is to show the relation between Porosity Coefficient and its effects on Diffraction Coefficient (Cd) by means of a suitable and verified numerical model. Por...
متن کاملanalysis of ruin probability for insurance companies using markov chain
در این پایان نامه نشان داده ایم که چگونه می توان مدل ریسک بیمه ای اسپیرر اندرسون را به کمک زنجیره های مارکوف تعریف کرد. سپس به کمک روش های آنالیز ماتریسی احتمال برشکستگی ، میزان مازاد در هنگام برشکستگی و میزان کسری بودجه در زمان وقوع برشکستگی را محاسبه کرده ایم. هدف ما در این پایان نامه بسیار محاسباتی و کاربردی تر از روش های است که در گذشته برای محاسبه این احتمال ارائه شده است. در ابتدا ما نشا...
15 صفحه اولSimulation of Bored Pile Construction
The installation of pile foundations is complicated by an enormous number of problems. They include unseen subsurface obstacles, lack of contractor experience, and site planning. These major problems and other minor ones make it difficult for the estimator to evaluate the piling project productivity and cost. Therefore, this study is designed to assess these problems using simulation. Both pili...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: FROPIL (Forum Profesional Teknik Sipil)
سال: 2020
ISSN: 2621-1440,2338-2791
DOI: 10.33019/fropil.v8i1.1700