Discussion on cost control experience in construction project management
نویسندگان
چکیده
منابع مشابه
Project Cost Control in the Nigerian Construction Industry
The construction industry being solely responsible for economic growth of the nation will base on the government’s fiscal policy and budget the formulation of its own policy plan on how to carry out development within that budget and equally give the nation a healthy developed environment. Besides, the overall aim of cost control and management is to make sure that scarce resources are utilized...
متن کاملAgile Construction Project Management
Project management in the information systems industry has had a poor record of delivering value and has consequently seized upon the recent evolutional of agile project management. What is meant by agile project management, from whence it originated and whether it has further applicability are not widely understood. The construction industry also has a less than perfect project management reco...
متن کاملRobust Optimization Strategies for Total Cost Control in Project Management
We describe robust optimization procedures for controlling total completion time penalty plus crashing cost in projects with uncertain activity times. These activity times arise from an unspecified distribution within a family of distributions with known support, mean and covariance. We develop linear and linear-based decision rules for making decisions about activity start times and the crashi...
متن کاملResearch on Cost Control of Construction Project Based on the Theory of Lean Construction and BIM: Case Study
Lean construction is a new type of management mode of construction project, which is especially suitable for those complex, changeable and speedy construction projects. Besides, building information model (BIM) is “computable digital information” created and utilized during the design and construction of buildings. This paper takes construction project as the object and combines BIM technology ...
متن کاملFlexible resource management and its effect on project cost and duration
In practice, most projects result in cost overruns and schedule slippage due to poor resource management. This paper presents an approach that aims at reducing project duration and costs by empowering project managers to assess different scenarios. The proposed approach addresses combinatorial modes for tasks, multi-skilled resources, and multiple calendars for resources. A case study reported ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Smart Construction Research
سال: 2018
ISSN: 2529-7740
DOI: 10.18063/scr.v2i3.587