Discussion of Issues on Waterproof Construction of Metro Station
نویسندگان
چکیده
منابع مشابه
a study on construction of iranian life tables: the case study of modified brass logit system
چکیده ندارد.
15 صفحه اولSimulation of Metro Train Fire in an Underground Station of Tehran Metro Line 7
In this research a fire scenario was simulated in one of the stations of the line 7 of Tehran's subway system. The Line 7 is under construction and the ventilation system is under design. Fire was set for a stopping metro train at the platform of the station. A 160 meter length eight-car metro train with the forth wagon on the fire was studied. The heat release rate is based on a quadratic f...
متن کاملA Budgeting Model for the Safety Unit of an Under Construction Metro Station in Tehran Using a Robust Optimization
Background: The construction of metro lines is a high-risk project. Using a budget-based model for the safety units of metro construction projects can help safety managers to spend optimal budget allocation. The purpose of this study was to plan a budget model based on safety unit performance in an under construction metro station for better budget allocation using robust optimization. Methods...
متن کاملeffect of oral presentation on development of l2 learners grammar
this experimental study has been conducted to test the effect of oral presentation on the development of l2 learners grammar. but this oral presentation is not merely a deductive instruction of grammatical points, in this presentation two hypotheses of krashen (input and low filter hypotheses), stevicks viewpoints on grammar explanation and correction and widdowsons opinion on limited use of l1...
15 صفحه اولذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Urban Transportation & Construction
سال: 2015
ISSN: 2424-8452,2251-2578
DOI: 10.18686/utc.v2i1.6