Discounted cash-flows analysis: An interactive fuzzy arithmetic approach

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Resource Investment Problem with Discounted Cash Flows

A resource investment problem is a project-scheduling problem in which the availability levels of the resources are considered as decision variables and the goal is to find a schedule, and resource requirement levels, such that some objective function optimizes. In this paper, we consider a resource investment problem in which the goal is to maximize the net present value of the project cash fl...

متن کامل

Resource Investment Problem With Discounted Cash Flows

A resource investment problem is a project-scheduling problem in which the availability levels of the resources are considered decision variables and the goal is to find a schedule and resource requirement levels such that some objective function optimizes. In this paper, we consider a resource investment problem in which the goal is to maximize the net present value of the project cash flows. ...

متن کامل

Capital budgeting techniques using discounted fuzzy versus probabilistic cash flows

Risk analysis involves the development of the probability distribution for the measure of effectiveness. The risk associated with an investment alternative is generally either given as the possibility of an unfavorable value of the measure of effectiveness or measured by the variance of the measure of effectiveness. In an uncertain economic decision environment, an expert’s knowledge about disc...

متن کامل

Optimizing Discounted Cash Flows in Project Scheduling - An Ant Colony Optimization Approach

The multimode resource-constrained projectscheduling problem with discounted cash flows (MRCPSPDCF) is important and challenging for project management. As the problem is strongly nondeterministic polynomial-time hard, only a few algorithms exist and the performance is still not satisfying. To design an effective algorithm for the MRCPSPDCF, this paper proposes an ant colony optimization (ACO) ...

متن کامل

Proj ect Scheduling with Discounted Cash Flows and Progress Payments

In all large scale projects, there correspond cash flows that incur throughout the life of the project. The scheduling of these projects to maximize the present value of the cash flows has been a topic of recent research. The basic assumption of earlier research is that the cash flows are mainly associated with some events of the project and they occur at the event realization times. However, i...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: European Journal of Economic and Social Systems

سال: 2001

ISSN: 1292-8895,1292-8909

DOI: 10.1051/ejess:2001115