منابع مشابه
Dynamic Management of Road Construction Operations on Site
Today road construction sites utilize more and more information modeling in design phases as well as model based 3-D machine control systems in site operations. For main contractor, the management and control of all the site operations is a demanding task including also many challenges created by continuously developing new technology. In the paper, the main requirements for successful dynamic ...
متن کاملStudy of Preference for each user on a Road Traffic Guide Robot Deployed at a Road Construction Site
Obstructing or controlling traffic flow for road construction can lead to a greater possibility of traffic accidents than usual. Drivers and pedestrians passing through a construction zone as well as road workers and signal men are exposed to the danger of traffic accidents. Therefore, as a follow-up of Youngwoo Lee (2015), this study analyzed the user preference on a road traffic guide robot b...
متن کاملConnected Tools in Digital Design
A s digital fabrication and digital design become more and more pervasive, the physical tools we use in conjunction will have to catch up. With the Internet of Things, cyberphysical systems, and Industry 4.0 in our midst, connecting and integrating measurement tools into design processes is a logical step. Here, we describe the first steps in that direction, coming from a variety of communities...
متن کاملOptimal Forest Road Density Based on Skidding and Road Construction Costs in Iranian Caspian Forests
Information on the productivity, costs and applications of the logging system is a key component in the evaluation of management plans for the rehabilitation and utilization of Caspian forests. Skidding and road construction costs are expensive forest operations. Determining the optimum forest road network density is one of the most important factors in sustainable forest management. Logging me...
متن کاملRoad-mix vs. Plant-mix in Bituminous Road Construction
below the surface through scarifier teeth. Emulsions and medium-curing and slow-curing asphalts were used. The travelling plant-mix was not entirely satisfactory because of conditions existing on this project. It is necessary to have the windrow of material quite wet in order to get it through the travelling pug-mill mixer. The project was built late in the fall, and the water did not evaporate...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: DEStech Transactions on Computer Science and Engineering
سال: 2018
ISSN: 2475-8841
DOI: 10.12783/dtcse/ceic2018/24560