Diamond Light Source: status and perspectives

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Status of Pohang Light Source

The Pohang Light Source (PLS) is a national users’ facility for basic and applied science research using synchrotron radiation. It consists of a 2-GeV linac as a full-energy injector and a low-emittance, thirdgeneration storage ring. It has been serving users since September of 1995. The beamlines have been increased from two to eight units as the increased number of users. The first undulator,...

متن کامل

Impact of the Diamond Light Source on research in Earth and environmental sciences: current work and future perspectives

Diamond Light Source Ltd celebrated its 10th anniversary as a company in December 2012 and has now accepted user experiments for over 5 years. This paper describes the current facilities available at Diamond and future developments that enhance its capacities with respect to the Earth and environmental sciences. A review of relevant research conducted at Diamond thus far is provided. This highl...

متن کامل

The Initial Insertion Devices for the Diamond Light Source

The first eight DIAMOND beamlines have now been agreed. Insertion devices must be tailored to meet the needs of each of these beamlines and so it is now clear what form the first insertion devices for DIAMOND will take. Six of the devices will be short period, small gap undulators designed to reach between approximately 5 to 20 keV with the use of high harmonics. Four of these devices will take...

متن کامل

Further Optimisation of the Diamond Light Source Injector

Optimisation of the Diamond Light Source injector has continued since user operation started in January 2007. Beam losses have been minimised by injector tuning and stabilisation, and high level software has been developed to characterise booster and injection parameters. Operation in top-up and single bunch storage ring fill modes are reported, and low-energy linac fault-mode studies are detai...

متن کامل

Operational Status of the Pohang Light Source*

Since 1995, the Pohang Light Source has been serving as the unique synchrotron radiation facility in Korea. In 2001, beam time scheduled for users was 4,056 hours. The actual beam time supplied to users was 3,806 hours recording a beam availability of 93.8%. Number of beamline experiments was 292, carried out by 1,087 users. On the technical side, the most important issue in PLS operation is th...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Philosophical Transactions of the Royal Society A: Mathematical, Physical and Engineering Sciences

سال: 2015

ISSN: 1364-503X,1471-2962

DOI: 10.1098/rsta.2013.0161