One of the most critical aspects open pit mining is dewatering and mine drainage systems. The NCP Open Pit Gold Mine located in Central Kalimantan. This study area has a range rainfall intensities durations from moderate to heavy. Good required manage runoff water reduce entering front loading. used daily intensity data 1994 2018. Using Mononobe Method, hydrological for this were evaluated by determining value plan. According evaluation 2018, research saw 86.23 mm/day over two-year return period. majority extracted mines precipitation rather than groundwater. An channel was made around pit, flowing naturally into sump area. pumped settling pond with 520 m3/hour 780 capacity pumps.
منابع مشابه
A genetic algorithm approach for open-pit mine production scheduling
In an Open-Pit Production Scheduling (OPPS) problem, the goal is to determine the mining sequence of an orebody as a block model. In this article, linear programing formulation is used to aim this goal. OPPS problem is known as an NP-hard problem, so an exact mathematical model cannot be applied to solve in the real state. Genetic Algorithm (GA) is a well-known member of evolutionary algorithms...
متن کاملNumerical modelling of the groundwater inflow to an advancing open pit mine: Kolahdarvazeh pit, Central Iran.
The groundwater inflow into a mine during its life and after ceasing operations is one of the most important concerns of the mining industry. This paper presents a hydrogeological assessment of the Irankuh Zn-Pb mine at 20 km south of Esfahan and 1 km northeast of Abnil in west-Central Iran. During mine excavation, the upper impervious bed of a confined aquifer was broken and water at high-pres...
متن کاملAn imperialist competitive algorithm for solving the production scheduling problem in open pit mine
Production scheduling (planning) of an open-pit mine is the procedure during which the rock blocks are assigned to different production periods in a way that the highest net present value of the project achieved subject to operational constraints. The paper introduces a new and computationally less expensive meta-heuristic technique known as imperialist competitive algorithm (ICA) for long-term...
متن کاملA new algorithm for the open-pit mine scheduling problem
For the purpose of production scheduling, open pit mines are discretized into threedimensional arrays known as block models. Production scheduling consists in deciding which blocks should be extracted, when they should be extracted and how each extracted block should be processed. Blocks which are on top should be extracted first, and capacity constraints limit the production each time period. ...
متن کاملslope stability analysis and assessment for further major failure of angooran open-pit mine
slope stability is one of the major and determiner parameters in the economy and safety of open pit mines. failure and consequently rupture of the slope caused no compensable economic and humanity losses. so, probability assessment of the further failure for presentation of damages and additional costs is of prime importance. in this research, stability analysis and probability assessment of th...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Riset geologi dan pertambangan
سال: 2022
ISSN: ['0125-9849', '2354-6638']
DOI: https://doi.org/10.14203/risetgeotam2022.v32.1214