Development of system information of building code checking in planning and permitting phase to improve building code compliance based on work breakdown structure (WBS) using building information modeling (BIM)

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Real-Time Building Information Modeling (BIM) Synchronization Using Radio Frequency Identification Technology and Cloud Computing System

The online observation of a construction site and processes bears significant advantage to all business sector. BIM is the combination of a 3D model of the project and a project-planning program which improves the project planning model by up to 6D (Adding Time, Cost and Material Information dimensions to the model). RFID technology is an appropriate information synchronization tool between the...

متن کامل

Using Building Topological Information to Check for Means of Egress Building Code Compliance

Means of egress code requirements are intended to provide provisions for design, construction and layout of building elements in order to provide a continuous and unobstructed path of travel from any point in a building or structure to a public way. Although research into automating building code compliance (i.e. for means of egress code requirements) is extensive, the question of how to effici...

متن کامل

Smart-BIM (Building Information Modeling)

Purpose After a long period of international research and development, BIM has become mature. Many tools support the BIM process, or at least they claim. BIM not only offers opportunities for the Architectural Engineering and Construction industry, but also for the client. In this paper we don’t focus on the professional client, but on the client of a building assignment that act as the end-use...

متن کامل

Building Information Management (BIM): From Planning Towards Work Process Tool?

The need for better integration and higher coordination in order to deliver the envisaged building requirements should avoid problematic situations in which the various professionals are not well informed about the building plans. This situation calls for more cooperative and interactive work practices e.g. at the interface between planning and production. Beside organisational gaps there are a...

متن کامل

Building Information Modeling (bim)-based Design of Energy Efficient Buildings

With the increased awareness of energy consumption as well as the environmental impact of building operations, architects, designers and planners are required to place more consideration on sustainability and energy performance of the building. To ensure most of those considerations are reflected in the building performance, critical design decisions should be made by key stakeholders early dur...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Physics: Conference Series

سال: 2021

ISSN: 1742-6588,1742-6596

DOI: 10.1088/1742-6596/1858/1/012091