Development of Partial Discharge Location Method of Power Cable
نویسندگان
چکیده
منابع مشابه
Partial Discharge (PD) HV and EHV Power Cable Systems
This chapter represents the state of the art at the time of release. Readers are encouraged to consult the link below for the version of this chapter with the most recent release date: Neither NEETRAC, GTRC, any member of NEETRAC or any cosponsor nor any person acting on behalf of any of them: a) Makes any warranty or representation whatsoever, express or implied, i. With respect to the use of ...
متن کاملMedium Voltage Cable System Partial Discharge
This chapter represents the state of the art at the time of release. Readers are encouraged to consult the link below for the version of this chapter with the most recent release date: Neither NEETRAC, GTRC, any member of NEETRAC or any cosponsor nor any person acting on behalf of any of them: a) Makes any warranty or representation whatsoever, express or implied, i. With respect to the use of ...
متن کاملOn-line Partial Discharge Monitor System of XLPE Power Cable Based on Virtual Instrument
High voltage XLPE power cable is a very important part of power system. The degree of electric-tree aging in the cable can be estimated effectually by measuring partial discharge. An on-line partial discharge monitor system of XLPE power cable was developed based on the virtual instrument designing conception. This system has the advantage of wide analog bandwidth, excellent anti-interference a...
متن کاملeffect of oral presentation on development of l2 learners grammar
this experimental study has been conducted to test the effect of oral presentation on the development of l2 learners grammar. but this oral presentation is not merely a deductive instruction of grammatical points, in this presentation two hypotheses of krashen (input and low filter hypotheses), stevicks viewpoints on grammar explanation and correction and widdowsons opinion on limited use of l1...
15 صفحه اولDSP Based On-line Partial Discharge Monitoring System for High Voltage Power Cable
In high voltage power cable system, partial discharge (PD) is a common phenomenon which reflects the degradation of insulation. When partial discharge happens inside the cable, leakage current will flow through the grounded conductor. To couple the partial discharge current, one feasible and effective method is placing a clamp-on high frequency current transformer around the grounded strap. In ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: IEEJ Transactions on Power and Energy
سال: 1992
ISSN: 0385-4213,1348-8147
DOI: 10.1541/ieejpes1990.112.8_727