DEVELOPMENT OF BRIDGE MANAGEMENT SYSTEM (BMS)
نویسندگان
چکیده
منابع مشابه
Development and Practical Application of a Bridge Management System (J-BMS) in Japan
This paper presents a new bridge management system (J-BMS). It is integrated with a concrete bridge rating expert system that can be used to evaluate the serviceability of existing concrete bridges. The proposed J-BMS not only evaluates the performance of bridges, but also offers a rehabilitation strategy based on a combination of maintenance cost minimization and quality maximization. In this ...
متن کاملdevelopment and practical application of a bridge management system (j-bms) in japan
this paper presents a new bridge management system (j-bms). it is integrated with a concrete bridge rating expert system that can be used to evaluate the serviceability of existing concrete bridges. the proposed j-bms not only evaluates the performance of bridges, but also offers a rehabilitation strategy based on a combination of maintenance cost minimization and quality maximization. in this ...
متن کاملApplication of J-BMS to Performance Evaluation and Remaining Life Prediction of an Existing RC Bridge
This paper describes a method of performance evaluation and remaining life prediction for an aged reinforced concrete (RC) T-girder bridge by J-BMS RC version via close visual inspection data, and also verifies the assessment results obtained as outputs from the Bridge Rating Expert System (RC-BREX) which is a subsystem of the J-BMS, to evaluate the effectiveness of the system. The Bridge Manag...
متن کاملThe New Ontario Bridge Management System
Ontario’s Ministry of Transportation (MTO) is responsible for the management of approximately 3000 bridges on the provincial highway network. The MTO in recent years has been evaluating developments in Bridge Management Systems in relation to its own requirements. The Ministry decided to develop an all-new system, similar in network-level functionality to modern systems developed in other count...
متن کاملMobile Model-Based Bridge Lifecycle Management System
This article discusses the requirements for developing a mobile model-based bridge lifecycle management system (MMBLMS). This new system should link all the information about the lifecycle stages of a bridge (e.g., design, construction, inspection, and maintenance) to a 4D model of the bridge incorporating different scales of space and time to record events throughout the lifecycle with suitabl...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Doboku Gakkai Ronbunshu
سال: 1997
ISSN: 0289-7806,1882-7187
DOI: 10.2208/jscej.1997.560_91