Development of a six drillhead roof bolting machine

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Noise Control for a Roof Bolting Machine: Collapsible Drill Steel Enclosure

The National Institute for Occupational Safety and Health (NIOSH) at the Pittsburgh Research Laboratory (PRL) is conducting research to reduce the noise exposures of roof bolting machine operators and to prevent additional cases of Noise Induced Hearing Loss (NIHL) thru the development of engineering noise controls. This paper describes and evaluates an engineering noise control for the roof bo...

متن کامل

The evolution of drill bit and chuck isolators to reduce roof bolting machine drilling noise

Among underground coal miners, hearing loss remains one of the most common occupational illnesses. To address this problem, the U.S. National Institute for Occupational Safety and Health Office of Mine Safety and Health Research (NIOSH OMSHR) conducts research to reduce the noise emission of underground coal mining equipment, an example of which is the roof bolting machine. Field studies show t...

متن کامل

The Introduction of Roof Bolting to U.s. Underground Coal Mines (1948-1960): a Cautionary Tale

Perhaps the most significant development in coal mine ground control during the last century was the introduction of roof bolting during the late 1940’s and 1950’s. From an engineering standpoint, roof bolts are inherently more effective than the wood timbers they replaced. Roof bolts promised to dramatically reduce the number of roof fall accidents, which then claimed hundreds of lives each ye...

متن کامل

development and implementation of an optimized control strategy for induction machine in an electric vehicle

in the area of automotive engineering there is a tendency to more electrification of power train. in this work control of an induction machine for the application of electric vehicle is investigated. through the changing operating point of the machine, adapting the rotor magnetization current seems to be useful to increase the machines efficiency. in the literature there are many approaches wh...

15 صفحه اول

Computer simulations help determine safe vertical boom speeds for roof bolting in underground coal mines.

PROBLEM Incident investigation reports do not usually contain enough information to aid in studying boom arm vertical speed for roof bolting machines to determine the impact that appendage speed had on an operator's risk of experiencing a contact. Laboratory experiments with human subjects are also not feasible because of safety and ethical issues. METHOD Researchers successfully developed a ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Mining Science and Technology

سال: 2017

ISSN: 2095-2686

DOI: 10.1016/j.ijmst.2016.11.010