Development and Operation of Deep-Sea Boring Machine System

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

development and implementation of an optimized control strategy for induction machine in an electric vehicle

in the area of automotive engineering there is a tendency to more electrification of power train. in this work control of an induction machine for the application of electric vehicle is investigated. through the changing operating point of the machine, adapting the rotor magnetization current seems to be useful to increase the machines efficiency. in the literature there are many approaches wh...

15 صفحه اول

Optimization of Cutting Parameters in Boring Operation

In the present work an attempt is made to select the combination of optimum cutting parameters which will result in better surface finish. Machining with optimum cutting parameters will result in minimum machining time and hence increasing the productivity. Four parameters viz. spindle speed, feed, depth of cut and length to diameter (L/D) ratio of boring bar has been taken as control factors. ...

متن کامل

EEG and ECG changes during deep-sea manned submersible operation

Background: Deep-sea manned submersible operation could induce mental workload and influence neurophysiological measures. Psychophysiological responses to submersible operation are not well known. The main aim of this study was to investigate changes in EEG and ECG components and subjective mental stress of pilots during submersible operation. Methods: There were 6 experienced submersible pilot...

متن کامل

the reliability of a tunnel boring machine

greater levels of complexity in tunnelling with tunnel boring machine (tbm) allow higher chances of failures that may increase the potential hazardous risks. this paper presents the results of a study on tbm reliability using risk analysis. machinery failure mode and effect analysis was applied to analyze the risks of a tbm using qs9000 and sae.j1739 recommendations. for this purpose, 48 failur...

متن کامل

Simulation of tunnel boring machine utilization: A case study

Utilization is one of the main managerial factors that is applied for construction process analysis well. It directly affects the project duration and construction costs. Therefore, a utilization study in tunneling projects is essential. In this work, the utilization of an earth pressure balance Tunnel Boring Machine (TBM) in Tabriz urban railway project was studied using the Monte Carlo simula...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Shigen-to-Sozai

سال: 2004

ISSN: 0916-1740,1880-6244

DOI: 10.2473/shigentosozai.120.425