Development and Application of Day-Ahead Generation Scheduling System in Ningxia Provincial Power Grid
نویسندگان
چکیده
منابع مشابه
Optimal Day-Ahead Scheduling of a Smart Distribution Grid Considering Reactive Power Capability of Distributed Generation
Abstract: In the traditional paradigm, large power plants provide active and reactive power required for the transmission system and the distribution network purchases grid power from it. However, with more and more distributed energy resources (DERs) connected at distribution levels, it is necessary to schedule DERs to meet their demand and participate in the electricity markets at the distrib...
متن کاملstability and attraction domains of traffic equilibria in day-to-day dynamical system formulation
در این پژوهش مسئله واگذاری ترافیک را از دید سیستم های دینامیکی فرمول بندی می کنیم.فرض کرده ایم که همه فاکتورهای وابسته در طول زمان ثابت باشند و تعادل کاربر را از طریق فرایند منظم روزبه روز پیگیری کنیم.دینامیک ترافیک توسط یک نگاشت بازگشتی نشان داده می شود که تکامل سیستم در طول زمان را نشان می دهد.پایداری تعادل و دامنه جذب را توسط مطالعه ویژگی های توپولوژیکی تکامل سیستم تجزیه و تحلیل می کنیم.پاید...
Day-Ahead Active Power Scheduling in Active Distribution Network Considering Renewable Energy Generation Forecast Errors
With large-scale integration of distributed energy resources (DERs), distribution networks have turned into active distribution networks (ADNs). However, management risks and obstacles are caused by this in due to renewable energy generation (REG) forecasting errors. In this paper, a day-ahead active power scheduling method considering REG forecast errors is proposed to eliminate the risks, min...
متن کاملChance-Constrained Day-Ahead Hourly Scheduling in Distribution System Operation
This paper aims to propose a two-step approach for day-ahead hourly scheduling in a distribution system operation, which contains two operation costs, the operation cost at substation level and feeder level. In the first step, the objective is to minimize the electric power purchase from the day-ahead market with the stochastic optimization. The historical data of dayahead hourly electric power...
متن کاملApplication Scheduling on the Information Power Grid
One of the compelling reasons for developing the Information Power Grid (IPG) is to provide a platform for more rapid development and execution of simulations and other resource-intensive applications. However, the IPG will ultimately not be successful unless users and application developers can achieve execution performance for their codes. In this paper , we describe a performance-eecient app...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Smart Grid
سال: 2013
ISSN: 2161-8763,2161-8771
DOI: 10.12677/sg.2013.33013