Development and Application of an Integrated Management System for Off-Site Construction Projects
نویسندگان
چکیده
The off-site construction (OSC) method has attracted the interest of experts to resolve productivity stagnation and lack skilled workforce reduce greenhouse gas emissions in industry. Due unique characteristics OSC projects, wherein building elements are produced a factory, transported, installed field, management approach that differs from techniques previous projects is required. Accordingly, with this study, we examined derived key items through literature review, case analysis, expert meetings develop an integrated system for (OSC-IMS). proposed system, OSC-IMS, integrates entire supply chain project. It includes following functions: drawing management, scheduling planning, site installation production monitoring, shipping transportation, delivery inspection, progress payment management. To verify applicability effectiveness it was implemented four projects. application studies demonstrated improvements work efficiency accuracy decreased waste time every step. findings indicate can enhance project performance. This study contributes identification features such these factors be linked managing development. describes overall effect on real
منابع مشابه
development and implementation of an optimized control strategy for induction machine in an electric vehicle
in the area of automotive engineering there is a tendency to more electrification of power train. in this work control of an induction machine for the application of electric vehicle is investigated. through the changing operating point of the machine, adapting the rotor magnetization current seems to be useful to increase the machines efficiency. in the literature there are many approaches wh...
15 صفحه اولAn Integrated Construction Management System for Site Precast Concrete
In order to manage site precast concrete construction which has been increasing, an integrated construction management system employing a unique 3-D modelling method and analogue process input method was developed. At the planning stage, the system supports interactive planning between member configuration and installation planning by a visual method and with an accurate quantity. At the proces...
متن کاملIntegrated knowledge management model and system for construction projects
In the past there has been no structured approach to learning from construction projects once they are completed. Now, however, the construction industry is adapting concepts of tacit and explicit knowledge management to improve the situation. Top managers generally assume that professionals in enterprises already possess tacit knowledge and experience for specific types of projects. Such knowl...
متن کاملan application of fuzzy logic for car insurance underwriting
در ایران بیمه خودرو سهم بزرگی در صنعت بیمه دارد. تعیین حق بیمه مناسب و عادلانه نیازمند طبقه بندی خریداران بیمه نامه براساس خطرات احتمالی آنها است. عوامل ریسکی فراوانی می تواند بر این قیمت گذاری تاثیر بگذارد. طبقه بندی و تعیین میزان تاثیر گذاری هر عامل ریسکی بر قیمت گذاری بیمه خودرو پیچیدگی خاصی دارد. در این پایان نامه سعی در ارائه راهی جدید برای طبقه بندی عوامل ریسکی با استفاده از اصول و روش ها...
application and construction of carbon paste modified electrodes developed for determination of metal ions in some real samples
ساخت الکترودهاِی اصلاح شده ِیکِی از چالشهاِی همِیشگِی در دانش شیمِی بوِیژه شیمِی تجزیه مِی باشد ،که با در نظر گرفتن سادگِی ساخت، کاربردی بودن و ارزان بودن روش مِی توان به باارزش بودن چنِین سنسورهاِی پِی برد.آنچه که در ادامه آورده شده به ساخت و کاربرد الکترودهاِی اصلاح شده با استفاده از نانو ذرات در اندازه گِیرِی ولتامترِی آهن وکادمِیم اشاره دارد. کار اول اختصاص دارد به ساخت الکترود خمِیر کربن اصلاح شده با لِیگاند داِ...
15 صفحه اولذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Buildings
سال: 2022
ISSN: ['2075-5309']
DOI: https://doi.org/10.3390/buildings12071063