Developing a Risk Management Process for Infrastructure Projects Using IDEF0

نویسندگان

چکیده

The Mass Rapid Transit (MRT) project is a massive, large-scale construction venture with complex interface. In order to reduce the risk of disasters and industrial accidents in save costs, simple flexible management system necessary for projects such as MRT. A set processes was identified through literature review data collection, Integration Definition Function Modeling (IDEF0) process used logical analysis. IDEF0 diagram clearly depicts items be delivered at each interface, reduced by facilitating flow on various items. results this research will applied other practical projects, special emphasis planning design stages. Future work verify whether implementation proposed does indeed effectively risks completed project.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Developing a Risk Management Model for Banking Software Development Projects Based on Fuzzy Inference System

Risk management is one of the most influential parts of project management that has a major impact on the success or failure of projects. Due to the increasing use of information technology (IT) systems in all fields and the high failure rate of IT projects in software development and production, it is essential to effectively manage these projects is essential. Therefore, this study is aimed t...

متن کامل

Qualitative Risk Management Framework to evaluate environmental risk events in infrastructure projects in developing countries

This paper presents a Qualitative Risk Analysis Framework to identify and prioritize environmental risks encountered in infrastructure projects, which is applied to developing countries. The framework incorporates consensus and quality of experts in the process of evaluating environmental risk events and is composed of (1) Fuzzy Expert System (FES) to determine attributes of experts; (2) Fuzzy ...

متن کامل

Resilient Project Management, A New Approache to Develop Project Management Knowledge (Case Study: Infrastructure Civil Projects Management)

Accepetance of the fact that the working context of civil projects is challenging can enhance the resiliency capacity and will increase the project management concentration for improving and developing the software and hardware capabilities to facilitate project success achievement. This article is documented based on a research results in macro-hydropower plants projects management context to ...

متن کامل

Risk Management Plan in Large Urban Projects

One of the risks distinguishes urban projects from other projects is to purchase of property obstacles. The matter is of more significance in large projects. Issues with regard to possessing property obstacles, lack of accurate layout drawings for underground facilities and following probable changes in designs make it vital to have specific studies on risk management of such projects. So thi...

متن کامل

analysis of the environmental projects risk management success using analytical network process approach

it is commonly recognized that knowledge is the only source of core competence of environmental projects in the knowledge based companies, but the productivity rate of knowledge workers is always low. based on knowledge workers’ characteristics, in this paper, we seek to identify knowledge workers factors influencing on the environmental projects risk management success (eprm), then knowledg...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Sustainability

سال: 2021

ISSN: ['2071-1050']

DOI: https://doi.org/10.3390/su13126958