Determining the periodicity and planned lead time in serial-production systems with dependent demand and uncertain lead time
نویسندگان
چکیده
منابع مشابه
An integrated vendor–buyer model with stochastic demand, lot-size dependent lead-time and learning in production
In this article, an imperfect vendor–buyer inventory system with stochastic demand, process quality control and learning in production is investigated. It is assumed that there are learning in production and investment for process quality improvement at the vendor’s end, and lot-size dependent lead-time at the buyer’s end. The lead-time for the first batch and those for the rest of the batches ...
متن کاملMRP with imprecise demand and uncertain lead time
Taking into account the uncertainty of real data in the planning process is a real challenge for nowadays companies. It is suggested in this communication to take into account the demand uncertainty, but also the uncertainty on the lead times, for deciding which quantities of components should be released, and when. In that purpose, the various situations that may happen are summarized in a gra...
متن کاملOptimal Relief Order Quantity under Stochastic Demand and Lead-time
In this paper, a newsboy model is developed under uniformly distributed lead-time and demand that is an appropriate assumption in obtaining optimal relief inventory of humanitarian disasters. It is noteworthy that limited historical data are in hand on relief operations. Hence, analytical and approximate solutions for optimal relief order quantity were derived. The effect of lead-time uncertai...
متن کاملDemand and Production Management with Uniform Guaranteed Lead Time
Recently, innovation-oriented firms have been competing along dimensions other than price lead time being one such dimension. Increasingly, customers are favoring lead time guarantees as a means to hedge supply chain risks. For a maketo-order environment, we explicitly model the impact of a lead time guarantee on customer demands and production planning. We study how a firm can integrate demand...
متن کاملAn Integrated Production-Supply System with Uncertain Demand, Nonlinear Lead Time and Allowable Shortages
A supply chain consisting of a single-supplier and a single-buyer is modeled and compared in two different modes: non-coordinated and coordinated. The model is established based on the fact that the demand is uncertain and shortages are considered as lost sales. The buyer’s order lead time is a nonlinear function of the buyer’s order size and the number of shipments from the supplier. Quantity ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Uncertain Supply Chain Management
سال: 2013
ISSN: 2291-6822,2291-6830
DOI: 10.5267/j.uscm.2013.06.002