Determining the Factors Influencing Construction Project Management Performance Improvement through Earned Value-Based Value Engineering Strategy: A Delphi-Based Survey

نویسندگان

چکیده

Proper planning and management of construction projects have long been regarded as a necessity. The ability to make sound decisions solve problems using appropriate performance reports related the project implementation process are two most key factors in controlling management. Even though these considerably contribute precise performance, previous research has failed investigate them their fullest potential. Therefore, this seeks fill existing gap by determining influential on through earned value-based value engineering strategy. In line, comprehensive literature analysis was undertaken extract performance. Then, three rounds Delphi survey were conducted consolidate factors. There total 39 that grouped into four categories. identified then evaluated quantitative data. findings showed dimension “Engineering economics” ranked first terms importance, followed “Project performance”, “Value approach”, “Earned management” at second fourth ranks, respectively. overall ranking placed Stakeholder Management” position Management Software” bottom place. It is anticipated effective recommendations study will improvement improve while enhancing different stakeholders’ understanding

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Value-based Software Engineering: a Case Study Using Earned Value

plex project. But it has absolutely nothing to say about the stakeholder value of the system the project is developing. It serves a purpose, but needs to be incorporated into feedback control systems that focus on the real stakeholder value being earned. The value-based software engineering agenda, described in the “Accounting for Value in Software Engineering” sidebar, seeks to integrate value...

متن کامل

Predicting project time and costs using earned value management based on trapezoidal fuzzy numbers

Projects include activities that must be carried out at certain dates, with specified costs and determined qualities in order to satisfy the stakeholders. Project control is one of the most important and widely used issues in project-based organizations and it has attracted a lot of attention. So far, in the field of project control, there have been a lot of research that were done in different...

متن کامل

Estimation of Project Performance Using Earned Value Management and Fuzzy Regression

Earned Value Management is a critical project managementmethodology that evaluates project performance from cost andschedule viewpoints. The novel theoretical framework presented in thispaper estimates future performance of project regarding the past relativeinformation. It benefits from fuzzy regression (FR) models in estimationprocess in order to deal with the vagueness and impreciseness ofre...

متن کامل

The Cost Monitoring of Construction Projects Through Earned Value Analysis

In construction industry, the term ‘procurement’ is considered as a project based job where clients and contractors are always keen to observe performance indicators. These indicators represent financial and non-financial efficiency of project activities. Among these, the monitoring of financial indicators is an important function of project management. Therefore, during the construction phase,...

متن کامل

Earned - Value Management Terminology

To the Editor: Although I enjoyed the article titled “Value-Based Software Engineering: A Case Study” (Barry Boehm and Li Guo Huang, March 2003, pp. 33-41), as a newly minted Project Management Professional and a contributor to the Project Management Institute’s Earned Value Analysis team, I was disappointed with the authors’ use of nonstandard terminology. The authors renamed the traditional t...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Buildings

سال: 2023

ISSN: ['2075-5309']

DOI: https://doi.org/10.3390/buildings13081964