Determining Optimum Maturity of Bush Romano Beans for Machine Harvest
نویسندگان
چکیده
منابع مشابه
Optimum harvest maturity for Leymus chinensis seed
Timely harvest is critical to achieve maximum seed viability and vigour in agricultural production. However, little information exists concerning how to reap the best quality seeds of Leymus chinensis, which is the dominant and most promising grass species in the Songnen Grassland of Northern China. The objective of this study was to investigate and evaluate possible quality indices of the seed...
متن کاملNon-Destructive Sensor-Based Prediction of Maturity and Optimum Harvest Date of Sweet Cherry Fruit
(1) Background: The aim of the study was to use innovative sensor technology for non-destructive determination and prediction of optimum harvest date (OHD), using sweet cherry as a model fruit, based on different ripening parameters. (2) Methods: Two cherry varieties in two growing systems viz. field and polytunnel in two years were employed. The fruit quality parameters such as fruit weight an...
متن کاملThe Big Bush Machine by
In this paper we study an example-machine Bush(S, T ) where S and T are disjoint dense subsets of R. We find some topological properties that Bush(S, T ) always has, others that it never has, and still others that Bush(S, T ) might or might not have, depending upon the choice of the disjoint dense sets S and T . For example, we show that every Bush(S, T ) has a point-countable base, is heredita...
متن کاملAn Optimum Algorithm for Single Machine with Early/Tardy Cost
The problem of determining the sequence of a set of jobs with the objective function of minimizing the maximum earliness and tardiness in one machine is studied. 
 Production systems like JIT are one of the many applications of the problem. This problem is studied in special cases and their optimal solutions are introduced with simple orders. In general, some effective conditions for ne...
متن کاملAn Optimum Algorithm for Single Machine with Early/Tardy Cost
The problem of determining the sequence of a set of jobs with the objective function of minimizing the maximum earliness and tardiness in one machine is studied. Production systems like JIT are one of the many applications of the problem. This problem is studied in special cases and their optimal solutions are introduced with simple orders. In general, some effective conditions for neig...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: HortTechnology
سال: 1999
ISSN: 1063-0198,1943-7714
DOI: 10.21273/horttech.9.3.448