Determination of Project Procurement Method with a Graphical Analytic Model
نویسندگان
چکیده
منابع مشابه
A Single Supplier Procurement Model With Random Yield
In this paper, we develop a procedure for selecting a supplier. Suppliers are characterized by their lead time, price and quality (random yield). Each purchased item is acceptable with a given probability and independent of the others. We assume the demands are deterministic with no set-up cost and backordering is allowed. For each supplier, an optimal ordering policy is developed. We prove the...
متن کاملAn Analytic and Graphical Method for LNA Design with Feedback
An analytic technique and figureof-merit (Fnm) for the trade-off of noise measure and mismatch loss in the design of low noise amplifier is presented. The trade-off between various design parameters as a function of inductive source degeneration is evaluated using the developed design curve. It is shown that the design curves are unique to the selected device. Several devices demonstrated condi...
متن کامل10708 Probabilistic Graphical Model Project
Topic Models such as PLSI[7] and LDA[1] have been widely used in text analysis communities as well as other fields such as computer vision. Since the original idea of LDA was proposed, there has been a great deal of extension work such as: supervised Topic Models[2], where a label node was introduced to the model; Hierarchical Dirichlet Processes[7], which solved the nuisance that the number of...
متن کاملthe innovation of a statistical model to estimate dependable rainfall (dr) and develop it for determination and classification of drought and wet years of iran
آب حاصل از بارش منبع تأمین نیازهای بی شمار جانداران به ویژه انسان است و هرگونه کاهش در کم و کیف آن مستقیماً حیات موجودات زنده را تحت تأثیر منفی قرار می دهد. نوسان سال به سال بارش از ویژگی های اساسی و بسیار مهم بارش های سالانه ایران محسوب می شود که آثار زیان بار آن در تمام عرصه های اقتصادی، اجتماعی و حتی سیاسی- امنیتی به نحوی منعکس می شود. چون میزان آب ناشی از بارش یکی از مولفه های اصلی برنامه ...
15 صفحه اولRanking Construction Project Alternatives with the Analytic Network Process Method
In evaluating construction investments, public or private sector owners often have several project alternatives, e.g. different sites for development and different types of building. Assessing each of them so as to identify the best for implementation is owners’ most important decision in the project planning stage. The traditional net present worth method has difficulty in including intangible...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Sustainability
سال: 2018
ISSN: 2071-1050
DOI: 10.3390/su10103583