Determination of Pressure Coefficient for a High-Rise Building with Atypical Ground Plan

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Preserving Ground Plan and Facade Lines for 3d Building Generalization

As 3D city models are becoming available and attractive for consumer purposes in personal navigation systems or visualization applications, the hardware used to visualize these models changes from special to consumer PCs or even to handheld and wireless devices. As a consequence, tools have been developed to alter single building models in their LOD in order to reduce the amount of data to be t...

متن کامل

Estimation of Coefficient of Pressure in High Rise Buildings Using Artificial Neural Network

Tendency to build more slender and more flexible tall buildings have made these structures susceptible to action of wind. Therefore, wind force is one of the prime considerations in design of tall buildings. The prediction of wind-induced pressure coefficients on the surface of the buildings is of considerable practical importance. Wind tunnel testing is one of the main methods for wind load de...

متن کامل

the innovation of a statistical model to estimate dependable rainfall (dr) and develop it for determination and classification of drought and wet years of iran

آب حاصل از بارش منبع تأمین نیازهای بی شمار جانداران به ویژه انسان است و هرگونه کاهش در کم و کیف آن مستقیماً حیات موجودات زنده را تحت تأثیر منفی قرار می دهد. نوسان سال به سال بارش از ویژگی های اساسی و بسیار مهم بارش های سالانه ایران محسوب می شود که آثار زیان بار آن در تمام عرصه های اقتصادی، اجتماعی و حتی سیاسی- امنیتی به نحوی منعکس می شود. چون میزان آب ناشی از بارش یکی از مولفه های اصلی برنامه ...

15 صفحه اول

Dual Control High-rise Building for Robuster Earthquake Performance

A dual passive control system is proposed for high-rise buildings. Since the proposed system needs a substructure supporting the main building, it is usually used in high-rise residential apartment houses where a parking tower is used as the substructure. This new system consists of a base-isolation system and a building-connection system. While base-isolated buildings and interconnected buildi...

متن کامل

Scheduling for High-rise Building Construction Using Simulation Techniques

High-rise buildings are commonly built in densely populated countries or urban areas. A balanced floor construction cycle is critical for construction of the frame structures. The objectives in scheduling the floor cycle are to ensure smooth flows of resources and to optimise the use of formwork and other materials. The floor area is usually divided into zones to allow the labour force and form...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Civil and Environmental Engineering

سال: 2018

ISSN: 2199-6512,1336-5835

DOI: 10.2478/cee-2018-0018