Detecting drainage pitfalls in open-pit mines and haul roads using UAV-photogrammetry
نویسندگان
چکیده
Open-pit mines generally have operational problems such as puddling and inappropriate water flow over haul roads, particularly if located in areas with high rainfall indices. These situations increase truck cycle times, promote rapid deterioration of haul-road wearing-course material, reduce productivity due to downtime road maintenance. In addition, costs are raised the frequency maintenance tire failures also increase. The use a high-resolution three-dimensional elevation model, created based on Unmanned Aerial Vehicle (UAV) photogrammetry, has been shown be an effective technique detect anomalies fast precise way. With proposed approach, it is possible diagnose conditions after or anticipate potential occurrence before they become greater problem. This diagnosis can then used prioritize activities open-pit mines. To describe methodology, case study presented demonstrating validating results obtained.
منابع مشابه
Volume analysis of open-pit mines on the basis of photogrammetry principles
The volume analysis of open-pit mines is important for preparing the plans for environmental recultivation. To assess the predictability of finances and deadlines it is indispensable to determine the exact amount of backfilling required. A geodetic survey presupposes a very time-consuming and special expertise; furthermore, accuracy depends on the experience of the expert and on the number of c...
متن کاملAn Approach to Locate an in Pit Crusher in Open Pit Mines
Transportation costs are a significant part of capital and operating costs of large open pit mines. Cost efficiency and high reliability of in pit crushing and conveying systems compared to conventional truck-shovel system makes it more appealing to be utilized in modern mining activities. In this paper the suitable location of an in pit crusher is investigated as a single hub location problem....
متن کاملDetermination of Ultimate Pit Limits in Open Mines Using Real Option Approach
Planning and design procedure of an open pit mining project just can be started after ultimate pit determination. In the carried out study in this paper it was shown that the most important factor in ultimate pit determination and in consequence in the whole planning and design procedure of an open pit mine is the metal price. Metal price fluctuations in recent years were exaggerated and impose...
متن کاملDetermination of the largest pit with the non-negative net profit in the open pit mines
The determination of the Ultimate Pit Limit (UPL) is the first step in the open pit mine planning process. In this stage that parts of the mineral deposit that are economic to mine are determined. There are several mathematical, heuristic and meta-heuristic algorithms to determine UPL. The optimization criterion in these algorithms is maximization of the total profit whilst satisfying...
متن کاملA quantitative model for evaluation and classification of blastings in open-pit mines
By evaluation of the blasting results, a proper blast pattern can be presented. It is, therefore, essential to employ a reliable method to evaluate blastings for the effective control and optimization of the main cycle operations. This paper aims to propose a criterion for evaluating the blasting results such as the fragmentation, muckpile condition, back-break, and fly rock, and to make a poss...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Dyna-colombia
سال: 2021
ISSN: ['0012-7353', '2346-2183']
DOI: https://doi.org/10.15446/dyna.v88n216.90801