DESIGN OF PONDOK NONGKO BRIDGE BANYUWANGI USING BOX GIRDER
نویسندگان
چکیده
منابع مشابه
OPTIMAL DESIGN OF NON-PRISMATIC REINFORCED CONCRETE BOX GIRDER BRIDGE: MINIMIZATION OF THE COST AND CO2 EMISSION
This paper presents a computational framework for optimal design of non-prismatic reinforced concrete box girder bridges. The variables include the geometry of the cross section, tapered length, concrete strength and reinforcement of box girders and slabs. These are obtained by the enhanced colliding bodies optimization algorithm to optimizing the cost and again CO2 emission. Loading and design...
متن کاملDrying and Cracking Effects in Box-girder Bridge Segment
This paper deals with the effect of drying as a moisture diffusion process in a segment of a typical box-girder bridge. Pore relative humidity distributions throughout the cross sections of the plates of the girder are calculated from the diffusion equation, taking its nonlinearity and aging into account. The effect of creep with aging on the stresses produced by drying shrinkage is taken into ...
متن کاملLoad Test and Model Calibration of a Horizontally Curved Steel Box-Girder Bridge
In this paper, full scale load test of a horizontally curved steel box-girder bridge is carried out in order to detect structural defects, which reportedly result in unwanted vibrations in nearby buildings. The bridge is tested under the passage of six heavy vehicles at different speeds, so as to determine its static and dynamic responses. A total number of one hundred and two (102) sensors are...
متن کاملdesign optimization of box type girder of an overhead crane
double bridge girder overhead cranes are used for heavy duty applications in theindustry. in this paper a detailed parametric design optimization of the main girder of box type isperformed for a 150ton capacity and 32m long span crane, after its basic design using availabledesign rules. design optimization is performed using detailed 3d finite element analysis bychanging the number, shape and l...
متن کاملDesign Optimization and Structural Performance Evaluation of Plate Girder Bridge Constructed Using a Turn-Over Process
A recent trend in bridge construction has been the optimization of the cost-to-performance ratio. The most effective way to optimize the cost-to-performance ratio is to maximize the efficiency of the superstructure. Currently, many bridge engineers and designers favor two- or three- girder plate superstructures, due to their cost advantages. However, research on the performance enhancements of ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Jurnal Rekayasa Sipil dan Lingkungan
سال: 2019
ISSN: 2548-9518
DOI: 10.19184/jrsl.v3i1.9329