Design of Microalloyed Steel Hot Rolling Schedules by Torsion Testing: Average Schedule vs. Real Schedule

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Possible Schedule of Transactions X Schedules That Meet Timing Constraints

This paper presents a technique that is capable of supporting four major requirements for concurrency control in real-time databases: transaction temporal consistency, transaction logical consistency, data temporal consistency, and data logical consistency, as well as tradeoos among these four requirements. The technique is based upon an object-oriented real-time database model in which each ob...

متن کامل

Effect of Composition on the Recrystallization Behavior of if Steels During Simulated Hot Strip Rolling

Flow curves are generated in muti-pass torsion tests for a titanium stabilized and a niobium stabilized IF steel. Two types of test schedule are used, one based on plate rolling and the other approximating strip rolling. The purpose of the former is to define the three critical temperatures of steel rolling. The strip schedules are varied in order to investigate the influence of increasing the ...

متن کامل

Fixed-time schedule effects in combination with response-dependent schedules.

We evaluated the effects of fixed-interval (FI), fixed-time (FT), and conjoint (combined) FI FT reinforcement schedules on the responding of 3 adults who had been diagnosed with schizophrenia. Responding on vocational tasks decreased for 2 of 3 participants under FT alone relative to FI alone. Responding under FI FT resulted in response persistence for 2 of 3 participants. Results have implicat...

متن کامل

Schedules of controlled substances: rescheduling of hydrocodone combination products from schedule III to schedule II. Final rule.

With the issuance of this final rule, the Administrator of the Drug Enforcement Administration reschedules hydrocodone combination products from schedule III to schedule II of the Controlled Substances Act. This scheduling action is pursuant to the Controlled Substances Act which requires that such actions be made on the record after opportunity for a hearing through formal rulemaking. This act...

متن کامل

A New Technique for Proppant Schedule Design

This study introduces a novel methodology for the design of the proppant pumping schedule for a hydraulic fracture, in which the final proppant distribution along the crack is prescribed. While the design is based on the assumption that the particles have relatively weak impact on the fracture propagation, the validity of this assumption can be tested a posteriori. This makes it possible to rel...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: ISIJ International

سال: 2010

ISSN: 0915-1559,1347-5460

DOI: 10.2355/isijinternational.50.1193