Design of Cascaded CORDIC Based on Precise Analysis of Critical Path

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

fabrication of new ion sensitive field effect transistors (isfet) based on modification of junction-fet for analysis of hydronium, potassium and hydrazinium ions

a novel and ultra low cost isfet electrode and measurement system was designed for isfet application and detection of hydronium, hydrazinium and potassium ions. also, a measuring setup containing appropriate circuits, suitable analyzer (advantech board), de noise reduction elements, cooling system and pc was used for controlling the isfet electrode and various characteristic measurements. the t...

critical discourse analysis of two political speeches in light of bakhtins dialogism

چکیده گفتگوگری باختین نظریه ای است که به تفاوت ها احترام گذاشته و گفتگو را ارج می نهد. رشته های مختلف علوم انسانی همواره از این نظریه بهره جسته اند. با وجود این تنها مطالعات اندکی در زمینه تجزیه و تحلیل نقادانه کلام به نظریه گفتگوگری پرداخته اند. پنداشت تحقیق حاضر بر آن است که احترام به حقوق دیگران از طریق فراهم آوردن شرایط یکسان برای بیان نظریات مختلف یکی از مهمترین مشترکات تحلیل انتقادی گفتم...

15 صفحه اول

Cascaded Multilevel Inverter Based on Quasi-Z-Source Converter: Analysis, Design and Study of Optimal Structures

In this paper, a new topology for cascaded multilevel inverter based on quasi-Z-source converter is proposed. In the proposed topology the magnitude of output DC voltage is not limited to the sum of magnitude of DC voltage sources. Moreover, the reliability of the circuit due to capability of short circuit by Z-source network is increased. The quasi-Z- source converter in different modes is ana...

متن کامل

the effect of using critical discourse analytical tools on the improvement of the learners level of critical thinking in reading comprehension

?it is of utmost priority for an experienced teacher to train the mind of the students, and enable them to think critically and correctly. the most important question here is that how to develop such a crucial ability? this study examines a new way to the development of critical thinking utilizing critical discourse analytical tools. to attain this goal, two classes of senior english la...

study of hash functions based on chaotic maps

توابع درهم نقش بسیار مهم در سیستم های رمزنگاری و پروتکل های امنیتی دارند. در سیستم های رمزنگاری برای دستیابی به احراز درستی و اصالت داده دو روش مورد استفاده قرار می گیرند که عبارتند از توابع رمزنگاری کلیددار و توابع درهم ساز. توابع درهم ساز، توابعی هستند که هر متن با طول دلخواه را به دنباله ای با طول ثابت تبدیل می کنند. از جمله پرکاربردترین و معروف ترین توابع درهم می توان توابع درهم ساز md4, md...

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Electronics

سال: 2019

ISSN: 2079-9292

DOI: 10.3390/electronics8040382