Delivery Times Scheduling with Deterioration Effects in Due Window Assignment Environments
نویسندگان
چکیده
In practical problems, in addition to the processing time of job, impact required for delivering service customers on cost is also considered, i.e., delivery time, where job a simple linear function its starting time. This paper considers past-sequence-dependent times (which can be referred as psddt) studied objectives three types due windows (common, slack and different windows). serves minimize weighted sum earliness, tardiness, size window, weights (coefficients) are related location. Through theoretical analysis optimal solution, it found that these problems solved O(NlogN), respectively, N number jobs.
منابع مشابه
Due-Window Assignment Scheduling with Variable Job Processing Times
We consider a common due-window assignment scheduling problem jobs with variable job processing times on a single machine, where the processing time of a job is a function of its position in a sequence (i.e., learning effect) or its starting time (i.e., deteriorating effect). The problem is to determine the optimal due-windows, and the processing sequence simultaneously to minimize a cost funct...
متن کاملDue-Window Assignment and Scheduling with Multiple Rate-Modifying Activities under the Effects of Deterioration and Learning
1 School of Management, State Key Laboratory for Mechanical Manufacturing Systems Engineering and The Key Laboratory of the Ministry of Education for Process Control and Efficiency Engineering, Xi’an Jiaotong University, Shaanxi Province, Xi’an 710049, China 2 Institut Charles Delaunay, Université de Technologie de Troyes and FRE CNRS 2848, Laboratoire d’Optimisation des Systémes Industriels (L...
متن کاملScheduling problems with a common due window assignment: A survey
In this article a survey of studies on scheduling problems with a common due window assignment and earliness/tardiness penalty functions is presented. A due window is a generalization of the classical due date and describes a time interval in which a job should be finished. If a job is completed before or after the due window, it incurs an earliness or a tardiness penalty, respectively. In this...
متن کاملScheduling with a due-window for acceptable lead-times
Due-dates are often determined during sales negotiations between customers and the sales team of the firm. In the preliminary (pre-sale) stage, the customer provides a time interval (due-window) of his preferred due-dates. This interval reflects acceptable leadtimes, which are functions of the customer resource constraints (e.g. storage or personnel limitations). If the due-dates are assigned e...
متن کاملSINGLE MACHINE DUE DATE ASSIGNMENT SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS AND CONTROLLABLE PROCESSING TIMES IN FUZZY ENVIRONMENT
In this paper, a due date assignment scheduling problem with precedence constraints and controllable processing times in uncertain environment is investigated, in which the basic processing time of each job is assumed to be the symmetric trapezoidal fuzzy number, and the linear resource consumption function is used.The objective is to minimize the crisp possibilistic mean (or expected) value of...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Mathematics
سال: 2023
ISSN: ['2227-7390']
DOI: https://doi.org/10.3390/math11183983