Delay factors in construction of healthcare infrastructure projects: a comparison amongst developing countries
نویسندگان
چکیده
منابع مشابه
Challenges of mega construction projects in developing countries
Mega Construction Projects (MCPs) represent a strategic option towards achieving sustainable development objectives in developing countries. On the one hand, these projects are charaterised with the need for high design knowledge and technical skills; competent human resources and managerial capabilities as well as excessive cost investment. Conversely, developing countries experience shortage ...
متن کاملThe Effects of Broadband Infrastructure on Economic Growth in Developing Countries
In this paper we investigate the effects of broadband infrastructure providing high speed internet, on economic growth in developing countries. We have used two different broadband measures to classify developing countries into two groups for the period 1999-2008. By using logistic diffusion model and IV approach, a nonlinear diffusion model is specified. Differences in ceiling of diffusion cur...
متن کاملAnalyzing delay causes in Egyptian construction projects
Construction delays are common problems in civil engineering projects in Egypt. These problems occur frequently during project life-time leading to disputes and litigation. Therefore, it is essential to study and analyze causes of construction delays. This research presents a list of construction delay causes retrieved from literature. The feedback of construction experts was obtained through i...
متن کاملQualitative Risk Management Framework to evaluate environmental risk events in infrastructure projects in developing countries
This paper presents a Qualitative Risk Analysis Framework to identify and prioritize environmental risks encountered in infrastructure projects, which is applied to developing countries. The framework incorporates consensus and quality of experts in the process of evaluating environmental risk events and is composed of (1) Fuzzy Expert System (FES) to determine attributes of experts; (2) Fuzzy ...
متن کاملRURAL ELECTRIFICATION projects in developing countries
OR has traditionally focused on the optimization of commercial companies’ problems in developed countries. However, it can also be used to solve social problems and to promote human development. OR for development deals with classical routing, location, planning and scheduling problems, as well as social constraints and requirements. These OR applications are mathematically as challenging as an...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Asian Journal of Civil Engineering
سال: 2020
ISSN: 1563-0854,2522-011X
DOI: 10.1007/s42107-020-00227-1