Delay Analysis of Stop Sign Intersection and Yield Sign Intersection based on VISSIM
نویسندگان
چکیده
منابع مشابه
Replacing the stop sign: unmanaged intersection control for autonomous vehicles
As computers inevitably begin to replace humans as the drivers of automobiles, our current human-centric traffic management mechanisms will give way to hyper-efficient systems and protocols specifically designed to exploit the capabilities of fully autonomous vehicles. We have introduced such a system for coordinating large numbers of autonomous vehicles at intersections [4, 5]. Our experiments...
متن کاملCooperative Intersection Collision Avoidance System – Stop Sign Assist Traffic-based Fot
We would like to acknowledge the help of Alec Gorjestani and Arvind Menon of the Intelligent Vehicle Laboratory who built, installed, and maintained the infrastructure data collection system. We would also like to acknowledge the help of Gary Davis of the Civil Engineering Department for assistance with the use of the WinBUGS software.
متن کاملReplacing the Stop Sign: Unmanaged Intersection Control for Autonomous Vehicles (Short Paper)
As computers replace humans as the drivers of automobiles, our current traffic management mechanisms will give way to hyper-efficient protocols designed to exploit the capabilities of fully autonomous vehicles. We have introduced such a system for coordinating large numbers of autonomous vehicles at intersections [2, 3]. Our experiments suggest that this system could alleviate many of the dange...
متن کاملModeling Reservation-based Autonomous Intersection Control in VISSIM
1 Autonomous vehicles are attracting more and more attention as a promising approach to improve 2 both highway safety and efficiency. Most previous studies on autonomous intersection 3 management relied heavily on custom-built simulation tools to implement and evaluate their 4 control algorithms. The use of the non-standard simulation platforms makes comparison between 5 different systems almos...
متن کاملeffect of seed priming and irrigation regimes on yield,yield components and quality of safflowers cultivars
این مطالعه در سال 1386-87 در آزمایشگاه و مزرعه پژوهشی دانشگاه صنعتی اصفهان به منظور تعیین مناسب ترین تیمار بذری و ارزیابی اثر پرایمینگ بر روی سه رقم گلرنگ تحت سه رژیم آبیاری انجام گرفت. برخی از مطالعات اثرات سودمند پرایمینگ بذر را بر روی گیاهان مختلف بررسی کرده اند اما در حال حاضر اطلاعات کمی در مورد خصوصیات مربوط به جوانه زنی، مراحل نموی، عملکرد و خصوصیات کمی و کیفی بذور تیمار شده ژنوتیپ های م...
ذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Procedia - Social and Behavioral Sciences
سال: 2013
ISSN: 1877-0428
DOI: 10.1016/j.sbspro.2013.08.228