Delay Analysis of OFDMA-Aloha
نویسندگان
چکیده
منابع مشابه
Buffered Aloha with K-Exponential Backoff -- Part II: Delay Analysis
This paper presents the delay analysis for buffered Aloha networks with K-Exponential Backoff. Mean access delay and mean queueing delay are derived and demonstrated via the examples of Geometric Retransmission (K=1) and Exponential Backoff (K=∞). The comparison shows that higher delay is incurred with Geometric Retransmission when the aggregate input rate is small, and the delay gap is enlarge...
متن کاملDelay distributions of slotted ALOHA and CSMA
In this paper, we derive the closed-form delay distributions of slotted ALOHA and nonpersistent carrier sense multiple access (CSMA) protocols under steady state. Three retransmission policies are analyzed. We find that under a binary exponential backoff retransmission policy, finite average delay and finite delay variance can be guaranteed for 2 and 4 3, respectively, where is the channel traf...
متن کاملOn Bistable Region of Slotted-ALOHA Systems with Delay Constraints
Bistable behavior of slotted ALOHA systems has been extensively investigated. It is proved that bistable region can be eliminated by limiting the number of allowable transmission attempts per packet to eight or less. In this paper, we investigate bistable behavior of slotted ALOHA systems with delay constraints in terms of the catastrophe theory. A lifetime of a packet is confined within D slot...
متن کاملStability Analysis of Hybrid ALOHA
We perform stability analysis of a recently proposed MAC protocol, hybrid ALOHA, based on the multipacket reception (MPR) model. Hybrid ALOHA distinguishes from conventional slotted ALOHA by allowing conditional collision-free channel estimation and simultaneous transmissions, and hence improves the MPR capability of the system. The stability analysis of the two-user case (N = 2) has been condu...
متن کاملDelay Analysis of Slotted ALOHA in Capture Channels for the Two User Case
We consider the effect of capture on delay in buffered slotted ALOHA based random access systems for the two user case. In a capture channel, at most one user can have a successful packet transmission when both users transmit. For symmetric Bernoulli arrival rates and a symmetric capture model, we characterize the average delay in terms of the retransmission probability and the capture model pa...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: IEEE Transactions on Wireless Communications
سال: 2013
ISSN: 1536-1276
DOI: 10.1109/twc.2012.113012.111776