Delay Analysis of In-Vehicle Internet Access Via On-Road WiFi Access Points
نویسندگان
چکیده
منابع مشابه
Wireless Internet Access: 3G vs. WiFi?
This article compares and contrasts two technologies for delivering broadband wireless Internet access services: "3G" vs. " WiFi". The former, 3G, refers to the collection of third generation mobile technologies that are designed to allow mobile operators to offer integrated data and voice services over mobile networks. The latter, WiFi, refers to the 802.11b wireless Ethernet standard that was...
متن کاملArrayPhaser: Enabling Signal Processing on WiFi Access Points
Signal processing on antenna arrays has received much recent attention in the mobile and wireless networking research communities, with array signal processing approaches addressing the problems of human movement detection, indoor mobile device localization, and wireless network security. However, there are three important challenges inherent in the design of these systems that must be overcome...
متن کاملSecurity Analysis of Public Wireless Internet Access Points (November 2004)
Over the past few years, wireless networks and wireless Internet have become ever increasingly popular, and with it, many security issues have arisen. An important topic is the security of wireless networks. This report investigates two possible solutions, Wired Equivalent Privacy (WEP) and Wi-Fi Protected Access (WPA). Both of these solutions can protect wireless communications from eavesdropp...
متن کاملEfficient Mobile Data Offloading Using WiFi Access Points
The wide-spread proliferation of smartphone-like devices has caused a tremendous increase in mobile data usage unmatched by the slower increasing available bandwidth. Consequently, this has caused severe traffic overloading in cellular networks. An immediate available remedy for this problem is offloading the traffic through WiFi access points. In this paper, we study the deployment and recruit...
متن کاملAn authentication scheme for fast handover between WiFi access points
In this paper, we propose an authentication scheme that is designed to reduce the authentication delay during a WiFi handover process. We observe that the largest part of the delay is due to the remote communications between the access point and the AAA Server that authorizes the access to the network. In order to eliminate remote communications, our scheme uses pre-authorization, and it pre-di...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: IEEE Access
سال: 2017
ISSN: 2169-3536
DOI: 10.1109/access.2017.2669178