Delay analysis in the discrete‐time multi‐server queue with batch arrivals of packets having deterministic length

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Multiserver Queue with Semi-Markovian Batch Arrivals with Application to the MPEG Frame Sequence

We consider a queueing system consisting of multiple identical servers and a common queue. The service time follows an exponential distribution and the arrival process is governed by a semi-Markov process (SMP). The motivation to study the queueing system with SMP arrivals lies in that it can model the auto-correlated traffic on the high speed network generated by a real time communication, for...

متن کامل

Analysis of unreliable bulk queue with statedependent arrivals

In this paper, we investigate a single-server Poisson input queueing model, wherein arrivals of units are in bulk. The arrival rate of the units is state dependent, and service time is arbitrary distributed. It is also assumed that the system is subject to breakdown, and the failed server immediately joins the repair facility which takes constant duration to repair the server. By using suppl...

متن کامل

Admission control and pricing in a queue with batch arrivals

We investigate a problem of admission control and pricing in a firm which dominates the market. In the model, there is a single server with exponential service times and arrivals follow a compound Poisson process where the number of customers in a group is an arbitrary discrete random variable. Each arriving group calculates the expected return for the whole group using the waiting cost per uni...

متن کامل

Disributions in a Priority Queue with Batch Arrivals

We consider a single-server priority queue with batch arrivals. We treat the head-of-the-line (HL) or preemptive-resume (PR) priority rule. Assuming that the arrival process of batches is renewal for each priority class and using the point process approach, we express the individual class queue-length distribution in terms of the waiting time and the completion time distributions. Assuming furt...

متن کامل

Queue dependent additional server queueing problem with batch arrivals

— We consider in this paper the steady state behaviour of a Queueing System with queue length dependent additional server facility wherein arrivais occur in batches of variable size. Whenever the queue length in front of the first server reaches a certain lenght, the system adds another server. Steady state probabilities and expected queue lengths in Single Server System and Additional Server S...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Electronics Letters

سال: 2020

ISSN: 0013-5194,1350-911X

DOI: 10.1049/el.2020.1560