Delay Analysis in Construction Project

نویسندگان

چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Understanding construction delay analysis – the role of pre-construction programming

Modern construction projects commonly suffer from delay in their completions. The resolution of time and cost claims consequently flowing from such delays continues to remain a difficult undertaking for all project parties. A common approach often relied on by contractors and their employers (or their representatives) to resolve this matter involves applying various delay analysis techniques, w...

متن کامل

Determining Optimal Risk Assessment Model in Construction Projects (Case study: steel plant construction project)

Introduction: Identifying occupational hazards and managing occupational safety and health risks is the most important mission and responsibility of the health and safety management system in organizations and adopting coded plans to achieve this is the key to continuously improving this system and promoting it. Method: This descriptive-analytic research has been written to determine the optim...

متن کامل

Agile Construction Project Management

Project management in the information systems industry has had a poor record of delivering value and has consequently seized upon the recent evolutional of agile project management. What is meant by agile project management, from whence it originated and whether it has further applicability are not widely understood. The construction industry also has a less than perfect project management reco...

متن کامل

Optimal Construction Project Planning

The nature of the construction industry combined with the lack of appropriate techniques and technologies suitable for construction work are among the main reasons for inadequate industry performance. Researchers need to develop a better understanding of the construction industry and develop approaches and technologies that will enable construction companies to do a better job in estimating, pl...

متن کامل

The resource-constraint project scheduling problem of the project subcontractors in a cooperative environment: Highway construction case study

Large-scale projects often have several activities which are performed by subcontractors with limited multi-resources. Project scheduling with limited resources is one of the most famous problems in the research operations and optimization cases. The resource-constraint project scheduling problem (RCPSP) is a NP-hard problem in which the activities of a project must be scheduled to reduce the p...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal for Research in Applied Science and Engineering Technology

سال: 2018

ISSN: 2321-9653

DOI: 10.22214/ijraset.2018.3355