Delay Analysis for End-to-End Synchronous Communication in Monitoring Systems

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

End-to-End Communication Delay Analysis in WirelessHART Networks

WirelessHART is a new standard specifically designed for real-time and reliable communication between sensor and actuator devices for industrial process monitoring and control applications. End-to-end communication delay analysis for WirelessHART networks is required to determine the schedulability of real-time data flows from sensors to actuators for the purpose of acceptance test or workload ...

متن کامل

Deterministic Formulization of End-to- End Delay for Multicast Systems

End-System multicasting (ESM) is a promising application-layer scheme that has been recently proposed for implementing multicast routing in the application layer as a practical alternative to the IP multicasting. Moreover, ESM is an efficient application layer solution where all the multicast functionality is shifted to the end users. However, the limitation in bandwidth and the fact that the m...

متن کامل

Forward End-To-End delay Analysis for AFDX networks

Packet switched networks and message multiplexing have been a major upgrade for industrial systems communications. In the avionics domain, this evolution was brought by the introduction of Avionics Full Duplex Switched Ethernet (AFDX). Guaranteed upper bounds of end-to-end delays for messages transmitted over an AFDX network are mandatory for certification reasons. In this article, we present t...

متن کامل

End-to-End Delay and Jitter Analysis in ATM Networks

In this paper the end-to-end performance evaluation of a tagged session is considered through the study of a tandem queueing network. A service discipline is adopted at each queue which allows for the study of First-Come First-Served (FCFS) as well as peak-rate-enforcing multiplexing schemes. A numerical approach is presented which allows for the computation of delay, jitter and inter-departure...

متن کامل

End to End Communication

End-to-end communication is the problem of sending a sequence of messages from one processor , the sender, to another processor, the receiver, through an unreliable communication network. This paper surveys positive and negative results concerning deterministic protocols for end-to-end communication in asynchronous networks and presents open questions.

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Sensors

سال: 2018

ISSN: 1424-8220

DOI: 10.3390/s18113615