Delay Analysis for End-to-End Synchronous Communication in Monitoring Systems
نویسندگان
چکیده
منابع مشابه
End-to-End Communication Delay Analysis in WirelessHART Networks
WirelessHART is a new standard specifically designed for real-time and reliable communication between sensor and actuator devices for industrial process monitoring and control applications. End-to-end communication delay analysis for WirelessHART networks is required to determine the schedulability of real-time data flows from sensors to actuators for the purpose of acceptance test or workload ...
متن کاملDeterministic Formulization of End-to- End Delay for Multicast Systems
End-System multicasting (ESM) is a promising application-layer scheme that has been recently proposed for implementing multicast routing in the application layer as a practical alternative to the IP multicasting. Moreover, ESM is an efficient application layer solution where all the multicast functionality is shifted to the end users. However, the limitation in bandwidth and the fact that the m...
متن کاملForward End-To-End delay Analysis for AFDX networks
Packet switched networks and message multiplexing have been a major upgrade for industrial systems communications. In the avionics domain, this evolution was brought by the introduction of Avionics Full Duplex Switched Ethernet (AFDX). Guaranteed upper bounds of end-to-end delays for messages transmitted over an AFDX network are mandatory for certification reasons. In this article, we present t...
متن کاملEnd-to-End Delay and Jitter Analysis in ATM Networks
In this paper the end-to-end performance evaluation of a tagged session is considered through the study of a tandem queueing network. A service discipline is adopted at each queue which allows for the study of First-Come First-Served (FCFS) as well as peak-rate-enforcing multiplexing schemes. A numerical approach is presented which allows for the computation of delay, jitter and inter-departure...
متن کاملEnd to End Communication
End-to-end communication is the problem of sending a sequence of messages from one processor , the sender, to another processor, the receiver, through an unreliable communication network. This paper surveys positive and negative results concerning deterministic protocols for end-to-end communication in asynchronous networks and presents open questions.
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Sensors
سال: 2018
ISSN: 1424-8220
DOI: 10.3390/s18113615