Delay Analysis for Current Mode Threshold Logic Gate Designs
نویسندگان
چکیده
منابع مشابه
MOS Current Mode Logic Near Threshold Circuits
Near threshold circuits (NTC) are an attractive and promising technology that provides significant power savings with some delay penalty. The combination of NTC technology with MOS current mode logic (MCML) is examined in this work. By combining MCML with NTC, the constant power consumption of MCML is reduced to leakage power levels that can be tolerated in certain modern applications. Addition...
متن کاملA Capacitive Threshold-Logic Gate
A dense and fast threshold-logic gate with a very high fan-in capacity is described. The gate performs sum-ofproduct and thresholding operations in an architecture comprising a poly-to-poly capacitor array and an inverter chain. The Boolean function performed by the gate is soft programmable. This is accomplished by adjusting the threshold with a dc voltage. Essentially, the operation is dynami...
متن کاملEfficient minimization Techniques for Threshold Logic Gate
optimization techniques are discussed using digital logic network using threshold logic. Almost same energy consumption changing speedup is possible using threshold network and many complex functions can be implemented using threshold logic with lesser number of logic gate and logic level for which these optimization techniques becomes popular for digital system design and applications. In this...
متن کاملLow Delay-Power Product Current-Mode Multiple Valued Logic for Delay-Insensitive Data Transfer Mechanism
Conventional delay-insensitive (DI) data encodings require 2N+1 wires for transferring N-bit. To reduce complexity and power dissipation of wires in designing a large scaled chip, a DI data transfer mechanism based on current-mode multiple valued logic (CMMVL), where N-bit data transfer can be performed with only N+1 wires, is proposed. The effectiveness of the proposed data transfer mechanism ...
متن کاملA Fault Tolerant Threshold Logic Gate Design
Threshold Logic gate is used as design abstraction for most nano devices and perceived as an alternate emerging technology to CMOS implementation. It is vulnerable to manufacturing inaccuracies that alter weight values which inadvertently affect the functionality of the gate. Hence fault tolerance should be taken in to consideration during the design of threshold logic gates to tolerate manufac...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: IEEE Transactions on Very Large Scale Integration (VLSI) Systems
سال: 2017
ISSN: 1063-8210,1557-9999
DOI: 10.1109/tvlsi.2016.2608953