Decision tools for earthquake risk management, including net present value and expected utility

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Expected net present value, expected net future value, and the Ramsey rule

Weitzman (1998) showed that when future interest rates are uncertain, using the expected net present value implies a term structure of discount rates that is decreasing to the smallest possible interest rate. On the contrary, using the expected net future value criteria implies an increasing term structure of discount rates up to the largest possible interest rate. We reconcile the two approach...

متن کامل

Expected net present value , expected net future value , and the Ramsey rule Christian

Weitzman (1998) showed that when future interest rates are uncertain, using the expected net present value implies a term structure of discount rates that is decreasing to the smallest possible interest rate. On the contrary, using the expected net future value criteria implies an increasing term structure of discount rates up to the largest possible interest rate. We reconcile the two approach...

متن کامل

Representing risk preferences in expected utility based decision models

The application and estimation of expected utility based decision models would benefit from having additional simple and flexible functional forms to represent risk preferences. The literature so far has provided these functional forms for the utility function itself. This work shows that functional forms for the marginal utility function are as useful, are easier to provide, and can represent ...

متن کامل

Project Portfolio Selection with the Maximization of Net Present Value

Projects scheduling by the project portfolio selection, something that has its own complexity and its flexibility, can create different composition of the project portfolio. An integer programming model is formulated for the project portfolio selection and scheduling.Two heuristic algorithms, genetic algorithm (GA) and simulated annealing (SA), are presented to solve the problem. Results of cal...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Bulletin of the New Zealand Society for Earthquake Engineering

سال: 2006

ISSN: 2324-1543,1174-9857

DOI: 10.5459/bnzsee.39.3.170-175