DECISION SUPPORT EVALUATION FOR BUILDING INFORMATION MODELING SOFTWARE SELECTION

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Modeling and development of a decision support system for supplier selection in the process industry

This paper presents the development of a model based decision support system with a case study on solving the supplier selection problem in a chemical processing industry. For the evaluation and selection of supplier, the analytical hierarchy process (AHP) and grey relational analysis (GRA) were used. The intention of the study is to propose an appropriate platform for process industries in ...

متن کامل

A Software Architecture for Decision Support of Building Sensor Data

Building operators need to interpret the high volumes of noisy data generated from the environmental sensors in their buildings. In this paper we propose a software architecture which processes the building monitor data to provide enhanced decision support in the form of assessments and accurate summaries to building operators in order to improve the quality of building performance. Our archite...

متن کامل

Fuzzy Multicriteria Decision Support for Information Systems Project Selection

This paper presents a fuzzy multicriteria group decision making approach for selecting information systems projects. The inherent subjectiveness and imprecision of the selection process is modeled by using linguistic terms characterized by triangular fuzzy numbers. To avoid the complex and unreliable process of comparing fuzzy numbers usually required in fuzzy multicriteria analysis, a new algo...

متن کامل

A Model-Driven Decision Support System for Software Cost Estimation (Case Study: Projects in NASA60 Dataset)

Estimating the costs of software development is one of the most important activities in software project management. Inaccuracies in such estimates may cause irreparable loss. A low estimate of the cost of projects will result in failure on delivery on time and indicates the inefficiency of the software development team. On the other hand, high estimates of resources and costs for a project wil...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Jurnal Teknologi

سال: 2015

ISSN: 2180-3722,0127-9696

DOI: 10.11113/jt.v75.5245