Decentralized multi-product multi-stage systems with backorders

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Modeling Multi-Echelon Multi-Supplier Repairable Inventory Systems with Backorders

This paper considers an inventory system responsible for repairable equipments located at several operational sites, each in different area. When a failure occurs at the operational site, spare parts are required. We analyze a multiple-supplier inventory system that includes an internal repair shop that offers several modes of repair with different repair times and an external supplier of spare...

متن کامل

A mixed integer linear programming formulation for a multi-stage, multi-Product, multi-vehicle aggregate production-distribution planning problem

In today’s competitive market place, companies seek an efficient structure of supply chain so as to provide customers with highest value and achieve competitive advantage. This requires a broader perspective than just the borders of an individual company during a supply chain. This paper investigates an aggregate production planning problem integrated with distribution issues in a supply chain ...

متن کامل

Multi-item-multi-plant inventory control of production systems with shortages/backorders

A multi-item model of a production-inventory system incorporating deterioration, shortages and capacity/budge constraints is considered. An optimal control policy for the model is developed using linear quadratic (LQ) theory for the case of deterministic demands. The problem of controlling large-scale production-inventory facilities is also considered, and the interaction prediction method is u...

متن کامل

Combination of Genetic Algorithm With Lagrange Multipliers For Lot-Size Determination in Capacity Constrained Multi-Period, Multi-Product and Multi-Stage Problems

 Abstract : In this paper a meta-heuristic approach has been presented to solve lot-size determination problems in a complex multi-stage production planning problems with production capacity constraint. This type of problems has multiple products with sequential production processes which are manufactured in different periods to meet customer’s demand. By determining the decision variables, mac...

متن کامل

Decentralized and Cooperative Multi-Sensor Multi-Target Tracking With Asynchronous Bearing Measurements

Bearings only tracking is a challenging issue with many applications in military and commercial areas. In distributed multi-sensor multi-target bearings only tracking, sensors are far from each other, but are exchanging data using telecommunication equipment. In addition to the general benefits of distributed systems, this tracking system has another important advantage: if the sensors are suff...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IIE Transactions

سال: 2008

ISSN: 0740-817X,1545-8830

DOI: 10.1080/07408170701488011